• At last, design method as well as construction craft and quality control specification of the technology of reinforcing soft loess foundation under high embankment with pile-raft system is proposed.

    最后提出了桩-筏式复合地基处理黄土地基方法及其设计施工方法。

    youdao

  • At last, design method as well as construction craft and quality control specification of the technology of reinforcing soft loess foundation under high embankment with pile-raft system is proposed.

    最后提出了桩-筏式复合地基处理黄土地基方法及其设计施工方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定