Give cost and time data for project tasks, the Six Sigma Black Belt should be able to compute the cost of normal and crash schedules and the minimum total cost schedule.
给出项目任务的成本和时间数据,六西格玛黑带应能计算出正常的和紧急加快的生产费用表以及最小的生产总费用表。
Most software projects can be considered at least partial failures, in the sense that few projects meet all their cost, schedule, quality, and requirements objectives.
很少项目能达到所有的成本、进度、质量和需求的目标,在这种意义上,大多数软件被认为至少是局部故障的。
Adverse trends might impact system design activity with corresponding risks to technical, cost, and schedule baselines, as well as to customer satisfaction.
有害趋势可能影响系统设计行为,并对技术、成本,以及进度基线,和客户满意度都有一定的风险。
The reuse of assets within the project can have a significant bearing on the project schedule, cost, and quality of the delivered system.
工程中资产的重新利用对于工程的时间进度表,成本,以及可交付系统的质量有十分重要的意义。
On one hand they are told to be agile, flexible, and adaptable, but on the other they are told to conform to pre-planned traditional Iron Triangle framework of scope, schedule, and cost.
一方面,人们告诉他们要敏捷、灵活、学会自我调整,另一方面,人们又告诉他们要遵从原有的传统铁三角框架,即范围、成本和日程。
Build a risk management plan that includes plans for dealing with risks related to technical issues, schedule, and cost.
应构建风险管理计划,包括处理与技术问题、日程表和成本相关风险的计划。
If all the issues been factored in, the given schedule and cost would have been accurate.
如果考虑了所有问题,给出的计划和成本就应该非常准确。
The Augustine panel questioned the cost, design and construction schedule of the rocket in a report submitted to the White House for consideration.
奥古斯汀专项研究小组质疑提交给白宫考虑的报告中的成本、设计以及建设计划。
Top-shelf tools may provide embedded software sizing "wizards" to assist in software sizing, the single most significant driver of development cost, effort, and schedule.
顶层的工具可能提供嵌入式的软件规模“向导”来援助软件的规模,它是影响到开发成本、工作量和进度的最重要的因素。
Especially when the customer isn't very technical, their vision of the final system could be vastly out of touch with the realities of cost, schedule, and feasibility.
尤其是当客户对技术不是非常精通时,他们对最终产品的期望肯能会很大程度的超出现实的成本、时间进度和可行性。
However, this only applies to the decisions affecting the product scope and hence the project's overall cost and schedule.
尽管如此,它仅仅适应于影响整个产品以及之后产品的整体成本和进度的决策。
High rejection counts would suggest either poor quality of work or a poor document review process; either could adversely impact cost, schedule, and customer satisfaction.
高拒绝频率要么暗示低品质的工作要么暗示一个不良文档的评审过程;任何一个都可以严重影响成本,进度,以及客户的满意度。
Adverse trends would indicate inadequate design and a need for rework, with negative impact on technical, cost, and schedule baselines — and potentially on the system's operational effectiveness.
有害趋势可以表明不适当的设计和重新工作的需求,对技术、成本,以及进度基线都有负面影响——还可能对系统的操作有效性有潜在影响。
I personally like doing a pointed weekly status which focuses on cost, schedule, risks and issues.
我喜欢每周通报项目状态,包括成本,计划,风险和问题。
The project manager, on the other hand, is more concerned with managing the project plan in terms of resources, schedule, and cost.
另一方面,项目管理者更加关注从资源、进度和成本等方面管理项目计划。
Of course, there is no guarantee that a licensed contractor will work more efficiently, in terms of cost and schedule, than an unlicensed one.
当然,不保证被许可的承包人比未许可的在成本和进度上工作的更有效率。
That included China's bottom-line iron ore price and every steelmaker's inventory, production cost, schedule and manufacturing details.
备忘录里有中方铁矿石价格底线以及每家钢铁制造商的存货、生产成本、计划以及制造工艺细节。
This also leads to high cost due to schedule delays, development workload, and extra test effort, and can result in lower quality delivery for globalization support.
同时还会因为进度表的延迟,开发工作量的增加,以及额外的测试工作导致成本增加,并且在全球化支持方面导致低质量的交付。
From this early prototyping effort, two main results emerge: a qualitative assessment of whether the project is technically feasible, and quantitative measures of project schedule and cost.
从早期的原型成果中可以得到两个结论:一个是关于这个项目的技术是否可行的定性评估,一个是项目日程表和成本的定量度量。
Adverse trends could indicate potential technical, cost, and schedule baseline issues.
有害趋势暗示潜在的技术,成本、以及进度基线的问题。
Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.
质量活动必须使成本和进度处于项目的控制之下,以满足CMM的精神。
Beyond the cost and schedule associated with the work, knowing you're dealing with a qualified professional gives you peace of mind with respect to the quality of the end result.
除了有关工作的花费及进度之外,获知正进行的是高质量专业化的项目会让您安心于最终结果的质量。
Agile COCOMO is a method and accompanying tool that are geared for lightweight incremental cost and schedule estimation.
敏捷COCOMO是一种用于轻量级的增量的成本和日程评估的工具。
This solution worked. The data was migrated for a relatively low cost, and without breaking the project's schedule or budget.
这个解决方法实行了,数据移植的开销相对降低了,并且没有打乱项目的工作安排和预算。
Anything else decreases productivity and increases the cost and schedule.
任何其他的情况都可能降低效率和增加成本、延长计划。
They're submitted to contractors and engineers, all of whom request changes, all of which (if they're visible, at least, or affect cost or schedule) are run by the client.
他们被提交给承包商和工程师,所有这些人都会请求更改,所有这些更改(如果可见,或至少影响成本或进度)都要由客户同意。
By the impact of the risk — the deviations of schedule, effort, or cost from plan if the risk materializes.
按照风险的影响——如果风险突然出现,与计划在进度、工作量或成本上的偏离。
Facilitating communication regarding the project scope, schedule, risk, performance, cost etc with the stakeholders throughout the project life cycle.
便于在整个项目生命周期中,对项目范围,进度,风险,绩效,成本等问题与项目干系人沟通。
Though the program has recently been in the spotlight due to significant cost growth and schedule delays, the Pentagon plans to buy a total of 2,457 of the three F-35 variants.
虽然最近在聚光灯下的该方案,由于成本显着的增长和进度拖延了,但国防部计划购买总数高达2457架f - 35变种。
Though the program has recently been in the spotlight due to significant cost growth and schedule delays, the Pentagon plans to buy a total of 2,457 of the three F-35 variants.
虽然最近在聚光灯下的该方案,由于成本显着的增长和进度拖延了,但国防部计划购买总数高达2457架f - 35变种。
应用推荐