• Consider the additional cost: You may need to consider the cost of developing or buying transformations, but careful cost planning will ensure that there is an overall cost reduction in the long run.

    考虑附加的成本:您可能需要考虑开发或购买转换的成本,但是谨慎的成本计划可以确保长期内的成本降低。

    youdao

  • The essence of cost planning is to enable the architect to control the cost of a project (within the target) while he is still designing.

    成本计划的实质就是使建筑师在设计时将工程成本控制在目标范围以内。

    youdao

  • The target-guided internal cost control system consists of cost planning subsystem, cost improvement subsystem, cost accounting and analysis subsystem as well as achievement evaluation subsystem.

    目标导向型内部成本控制体系由成本规划子系统、成本改善子系统、成本核算与分析子系统及绩效评价子系统组成。

    youdao

  • There is a lack of unified standard and workable management solution of Environment Cost planning, control and evaluation for thermal power plant now.

    但是目前针对火力发电企业环境成本管理工作的规划、控制、评价缺乏统一的标准和切实可行的管理方案。

    youdao

  • There is a lack of unified standard and workable management solution of Environment Cost planning, control and evaluation for thermal power plant now.

    但是目前针对火力发电企业环境成本管理工作的规划、控制、评价缺乏统一的标准和切实可行的管理方案。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定