• The essence of cost planning is to enable the architect to control the cost of a project (within the target) while he is still designing.

    成本计划实质就是使建筑师在设计时将工程成本控制目标范围以内

    youdao

  • There is a lack of unified standard and workable management solution of Environment Cost planning, control and evaluation for thermal power plant now.

    但是目前针对火力发电企业环境成本管理工作的规划控制评价缺乏统一标准切实可行的管理方案

    youdao

  • At the same time, the initial cost planning is something that poorly can be done without getting information about manufacturing, supply and other related elements.

    同时初步成本计划完全可以考虑生产供应其他相关因素

    youdao

  • For the plan of project cost, this thesis took the order of "break down - summary - decomposition" to introduce inductive methods of the cost planning in construction industry.

    对于项目本钱计划制定,本文分解-汇总-分解思路,对施工行业本钱计划制定方法进行回纳。

    youdao

  • For the implementation of the cost planning, the thesis explained how to conduct the project cost control from the material costs, labor costs, machinery costs, time costs and quality costs.

    成本计划执行方面材料成本人工成本、机械成本、工期成本、质量成本几个主要方面讲述了如何进行项目成本制约

    youdao

  • Consider the additional cost: You may need to consider the cost of developing or buying transformations, but careful cost planning will ensure that there is an overall cost reduction in the long run.

    考虑附加的成本可能需要考虑开发购买转换成本,但是谨慎的成本计划可以确保长期内的成本降低

    youdao

  • The target-guided internal cost control system consists of cost planning subsystem, cost improvement subsystem, cost accounting and analysis subsystem as well as achievement evaluation subsystem.

    目标导向型内部成本控制体系成本规划子系统、成本改善子系统、成本核算分析子系统及绩效评价子系统组成。

    youdao

  • As a part of moving to a cloud computing environment, companies use planning processes and tools to achieve cost reductions, improve speed to systems deployment, and improve systems availability.

    作为移动计算环境一部分公司利用规划流程工具实现成本下降提高系统部署速度提高系统可用性

    youdao

  • Planning aside, nuclear plants can be hard to finance, since they cost more and take longer to build than coal - or gas-fired units.

    撇开规划不说,相比煤气作燃料,核电站成本更高建设周期更长,因而资金筹措相当困难。

    youdao

  • You must factor the cost of developing (or buying) transformations, but careful planning helps ensure there is an overall cost reduction.

    必须考虑转换开发(购买)成本谨慎计划可以帮助确保成本的整体减少

    youdao

  • Whether moxifloxacin will fulfil its promise remains to be seen. Dr Schulman's model, though, has cost as a second element, which should certainly help the alliance with its planning.

    莫西沙星是否完成使命还有待观察,然而舒尔曼模型成本列为第二要素应该可以帮助联盟确定自己的规划。

    youdao

  • The adoption of SOA in business computing environments is growing due to the promise of significant cost reduction in the planning, deployment, and operation of IT projects through reuse.

    由于SOA承诺通过重用极大降低IT项目规划部署运营成本企业计算环境中SOA采用增长趋势

    youdao

  • The time spent properly planning the project will result in reduced cost and duration and increased quality over the life of the project.

    花些时间进行适当规划可降低成本缩短时间提高项目生命周期内的质量

    youdao

  • Compared with the technological investments needed to reduce greenhouse gas emissions globally, the cost of meeting the current demand for family planning is cheap.

    与那些为了在全球范围内减少温室气体排放花费技术研发费用相比,维持现有生育计划更为省钱。

    youdao

  • The increasing adoption of SOA in the industry brings the promise of significant cost reduction in the planning, deployment, and operation of IT projects.

    行业SOA应用普及有望极大降低IT项目规划部署运营成本

    youdao

  • There is always a fixed initial cost associated with planning and running a test: it is better to depreciate this start-up cost across the findings from multiple users.

    初始运行成本测试计划相关多个用户对于降低最初成本效果更好

    youdao

  • Most software engineering texts spend some amount of copy on project planning and estimating, including tools like the Constructive Cost Model (COCOMO).

    大多数软件工程学课本都花费篇幅介绍项目计划估计包括类似ConstructiveCostModel (COCOMO) 5这样的工具

    youdao

  • Do Some Weekly Meal PlanningA little meal planning can reduce the cost of preparing a meal by preventing you from overspending on ingredients you don't need.

    一些膳食计划——1份膳食计划可以防止花费过多的金钱购买需要的作料,进而减少准备膳食的花费。

    youdao

  • Scientists at Fujitsu Laboratories are planning to commercially sell products incorporating the new wireless charging system as early as 2012 but did not disclose how much they would cost.

    富士通公司实验室的研究人员计划最早于2012年让采用这种系统产品上市,他们透露这些产品的售价。

    youdao

  • The planning space (cost and time constraints, team composition and productivity, stakeholder communication, incremental result sequences, etc.)

    计划(成本时间制约团队组成生产力涉众交流递增结果序列等等)。

    youdao

  • Dr Schulman's model, though, has cost as a second element, which should certainly help the alliance with its planning.

    尽管舒尔曼博士模型作为第二要素花费,但是他的模型的确帮助了该联盟的计划。

    youdao

  • The project is still in the planning stages with discussions over security, logistics and cost under way with Israel.

    这个项目草拟阶段,正在以色列进行有关安全后勤供应以及成本方面讨论

    youdao

  • She is responsible for a comprehensive range of responsibilities including short and long term financial planning, cost control, cash management, accounting and human resource administration.

    负责范围广泛的各种责任包括短期长期财务规划成本控制现金管理会计人力资源管理。

    youdao

  • This data includes, for example, maintenance plant and cost center, structure indicator, superior functional location and the maintenance planning group responsible.

    这些数据包括维护工厂成本中心结构标识上级功能位置负责维护计划组等数据。

    youdao

  • How to take into account of demand side management (DSM) in electric power planning to minimize cost is one hot topic in the energy study field of the world.

    电力规划中考虑需求管理方案从而实现成本最小化近些年来世界能源领域研究热点问题。

    youdao

  • In civil engineering construction is much bigger in both cost and time than design and planning.

    土木工程建设中,施工所用的时间费用远比设计规划花费的

    youdao

  • The project manager spends time planning, managing, assessing, and controlling scope, time, cost, quality, risk, resources, and customer satisfaction.

    项目经理时间做的事情包括:规划管理分派任务控制范围、时间成本质量风险资源客户满意度

    youdao

  • The project manager spends time planning, managing, assessing, and controlling scope, time, cost, quality, risk, resources, and customer satisfaction.

    项目经理时间做的事情包括:规划管理分派任务控制范围、时间成本质量风险资源客户满意度

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定