Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
The initial core loading program, nuclear safety and nuclear monitoring during the core loading and temporary instrumentation system for Qinshan NPP is described.
本文介绍秦山核电厂首次装料程序、装料中的核安全与核监测,以及装料试验用的临时核测仪表和设备。
The initial core loading test indicated that overall planning and careful preparing before loading test is basic to success this test. Test results agreed with acceptance criteria.
首次装料试验结果表明,仔细筹划、充分准备是装料试验成功的基础,试验结果满足验收准则。
The expert knowledge library for Daya Bay and Qinshan phase II NPP has been established based on expert knowledge, and the reload core loading pattern heuristic search is performed with this library.
依赖于专家知识建立了大亚湾核电站和秦山第二核电厂换料堆芯装载知识库,在此基础上进行换料堆芯装载方案启发式优化搜索。
The expert knowledge library for Daya Bay and Qinshan phase II NPP has been established based on expert knowledge, and the reload core loading pattern heuristic search is performed with this library.
依赖于专家知识建立了大亚湾核电站和秦山第二核电厂换料堆芯装载知识库,在此基础上进行换料堆芯装载方案启发式优化搜索。
应用推荐