The GG temperature control can be realized by regulating the flow regulator start-up flow rate, the start time from start-up to main stage and the regulator operating condition transfer rate.
起动过程中发生器温度的控制依靠选择合适的流量调节器起动流量、转级时间和转级速率来实现。
Is engineering design parameter, start construction quantity control, start construction to check before acceptance to assess of main basis.
是工程设计参数、施工质量控制、施工验收评定的主要依据。
The Driver can be furnished with a trigger cycle start control or with push-to-start motors.
驱动器可以安装触发循环控制或一键启动发动机。
The Driver can be furnished with a trigger cycle start control or with push-to-start motors.
驱动器可以安装触发循环控制或一键启动发动机。
应用推荐