The planning and control phase can be divided into activities for planning and activities for control.
计划和控制阶段可以被分为用于计划的活动和用于控制的活动。
At present, the cost control of many outsourcing companies is still in the traditional cost-control phase.
目前很多业务外包企业的成本控制尚处在传统成本控制阶段。
Thyristor control phase shifter (TCPS) is one of the new facilities implemented in power network, leading to the development of economically efficient and technically reliable system.
晶闸管控制移相器(TCPS)是电力网络中的新设备之一,借以改善电力系统运行的经济性和可靠性。
Thyristor control phase shifter (TCPS) is one of the new facilities implemented in power network, leading to the development of economically efficient and technically reliable system.
晶闸管控制移相器(TCPS)是电力网络中的新设备之一,借以改善电力系统运行的经济性和可靠性。
应用推荐