• Workflow way gives the developer a unified control flow.

    工作流方式给开发人员提供了统一的控制流。

    youdao

  • The controller.xml file contains an XML representation of the control flow.

    xml文件包含控制流的xml表示形式。

    youdao

  • Using the Dynamic UI Manager API, the following control flow would be implemented.

    使用DynamicUIManagerAPI,可以实现以下控制流。

    youdao

  • In the models we studied, we observed that often control flow is used to capture events.

    在我们研究的模型中,我们发现控制流常被用来捕捉事件。

    youdao

  • This makes it easier to understand... The workflow itself expresses the allowed control flow.

    这让逻辑更容易理解……工作流本身描述了允许的控制流。

    youdao

  • A start node can only issue control flow, while stop and end nodes can also receive data flow.

    开始节点只能发出控制流,而停止和结束节点还可以接收数据流。

    youdao

  • The new scheduler infrastructure provides easier handling of control flow execution scheduling.

    新的调度程序基础设施能够轻松处理控制流执行调度。

    youdao

  • Supplies variables, expressions, and control flow to facilitate more complicated decision making.

    提供变量、表达式和控制流,以促进更复杂的决策制定。

    youdao

  • InputPortlet: Collects input from the customer and displays output data based on the control flow.

    InputPortlet:从用户收集信息,并基于控制流显示输出数据。

    youdao

  • You could not model these decisions in the first approach, because it only showed the control flow.

    第一种方法只能显示控制流,因此您无法用它建立这些decision的模型。

    youdao

  • Drag an icon to the right of the Start operator that appears by default in your control flow design.

    把一个图标拖到控制流设计中默认出现的start操作符的右边。

    youdao

  • Use the ICONS on the upper tool bar to validate the control flow and then debug or execute it as desired.

    使用上面工具栏中的图标检查控制流,然后调试或执行它。

    youdao

  • The control flow (i.e., the sequencing of these invocations) is implicit and emerges as the rules fire off.

    控制流(例如这些调用的顺序)是隐式的,并在规则触发时显现出来。

    youdao

  • Repeat Steps 6-8 above to add the data flow that populates the DWADMIN.HOLDINGS table to this control flow.

    重复步骤 6-8,把填充 DWADMIN.HOLDINGS表的数据流添加到控制流中。

    youdao

  • Consequently, a modeling practice that captures events with control flow leads to various semantic problems.

    因此,意在用控制流捕获事件的建模行为会导致多种语义问题。

    youdao

  • I think you'll also see us explore scripting languages as means of defining control flow in the 2.1 release.

    我想你还能在2.1版本中看到我们使用脚本语言来定义控制流程的探索。

    youdao

  • To keep things simple, you'll create a basic control flow in this article by completing the following steps.

    为了简单,本文中按以下步骤创建一个基本的控制流。

    youdao

  • First, you need to add an assign activity to your process control flow before the invoke activity (see Figure 10).

    首先,在调用活动之前,您需要将分派活动添加到流程控制流(请参见图10)。

    youdao

  • Gateway form using decision, fork, merge, and joins is often more readable for models that only model control flow.

    网关形式使用decision、fork、merge和join元素,对于只包含控制流的模型而言,此形式通常更易于理解。

    youdao

  • The GENERIC trees are converted into GIMPLE form and a subsequent control flow graph to support SSA-based optimizations.

    generic树被转换成GIMPLE形式,进而转换成控制流图,以支持基于SSA的优化。

    youdao

  • Before you build a control flow that invokes each of your data flows, you should verify that each data flow works correctly.

    在构建调用这些数据流的控制流之前,应该确认每个数据流可以正确地工作。

    youdao

  • With your two data flows developed and tested, you're ready to build a control flow that executes these in the correct order.

    两个数据流已经开发并测试完了,现在可以构建一个以正确次序执行它们的控制流。

    youdao

  • If he wants to understand an import use case, he would want to see the control flow, and would benefit from a sequence diagram.

    如果想要了解一个重要的用例,用户则需要看到控制流程,在这种情况下,序列图是个不错的选择。

    youdao

  • New elements exist for accept time event, control flow, object flow, flow final, accept event action, and interruptible region.

    增加了用于接受时间事件(accept timeevent)、控制流程(control flow)、对象流(object flow)、流终端(flowfinal)、接受事件动作(accept event action)以及可中断的区域(interruptible region)的新元素。

    youdao

  • A set of generator objects is wrapped in a scheduler function that controls delegation of control flow to an appropriate branch.

    scheduler函数中包装了一组生成器对象,这个函数控制将控制流委托给合适的分支的过程。

    youdao

  • Figure 22 shows an example using control flow to capture the logic behind several initial and final events that occur in a process.

    在图22显示的示例中,是用控制流捕获流程中发生的几个初始和最终事件背后的逻辑的。

    youdao

  • Examine multiple occurrences of the same reused activity for redundancy and possible improvements of the control flow of the process.

    检查同一个被重用活动是否多次出现,以找出冗余,以及是否有可能对流程的控制流做出改进。

    youdao

  • Data inputs and outputs are visible when the model is viewed in advanced editing mode; in basic mode only the control flow is visible.

    当在高级编辑模式下查看模型时,数据输入和输出是可见的;在基本模式下则只能看到控制流。

    youdao

  • For models that show control flow only, both forms can be used interchangeably and the models will preserve their execution semantics.

    对于仅显示控制流的模型,这两种形式可以互换,模型将保留其本身的语义。

    youdao

  • You can only add additional control flow inputs and outputs to an activity after dragging and dropping it into a reusing process model.

    当您将某个活动拖放到采用重用方法的流程模型中之后,只能向该活动添加更多的控制流输入和输出。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定