• Control CAPEX budget for minor project, direct purchase, review CAPEX pr, develop WBS, release budget and control it within the range approved by the Board.

    项目、零购的资本性支出预算控制审核资本性支出的采购申请,编制WBS释放预算控制董事会批准预算内。

    youdao

  • This paper analogy the selection of voltage space vector and the flux linkage estimate model of the direct torque control system of PMSM, and the realizing project of the system.

    文章分析永磁同步电机直接转矩控制系统电压空间矢量选择估计模型提出了系统的实现方案

    youdao

  • So, this project adopts the realization scheme of double-pass raster monochromator plus direct drive and direct reading of the raster's angle position to control.

    因此设计采用光栅单色仪直接驱动直接读取光栅位置控制实现方案

    youdao

  • The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period.

    工程成本控制主要放在内部管理上,特别是直接工程费工期有效控制,其次外部市场因素和施工阶段的变更索赔也是着重考虑的一个方面。

    youdao

  • This paper introduces two kinds of control project used in motor speed adjusters at present, which are vector control technology and direct torque control technology (DTC).

    介绍目前广泛使用电机调速控制方案矢量控制技术直接转矩控制技术。

    youdao

  • On the basis of the scheme, a stator flux estimate technique based on stator resistance compensation is also presented, and the simulation system of the direct torque control project is established.

    基础上提出定子电阻整定定子估计方法,并建立一个定子磁场定向直接转矩控制仿真系统

    youdao

  • The project is of great significance for aircraft manufactures and airlines to evaluate direct operating cost (DOC) and control aircraft design.

    科研项目飞机制造商航空公司飞机设计宣传,控制成本方面有着极其重要意义。

    youdao

  • ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.

    摘要介绍ap1000三门项目首次送电整体进度控制过程针对现场执行过程中执行计划与基准计划的偏差进行分析

    youdao

  • Upon the request of assessing the disaster mitigation effect in geologic disaster prevention and control project, direct and indirect economic efficacies have been taken as two general indicators.

    根据地质灾害防治工程减灾经济效益评估需要将其划分通用直接经济效益间接经济效益。

    youdao

  • Quality control information of engineering in a company is the direct record of construction project quality and the core of finished construction information.

    竣工文件基本设计重要技术资料,是国家科技档案的重要组成部分。

    youdao

  • Quality control information of engineering in a company is the direct record of construction project quality and the core of finished construction information.

    竣工文件基本设计重要技术资料,是国家科技档案的重要组成部分。

    youdao