Cubic is under contract to Teledyne Scientific & Imaging LLC, prime contractor for the EXACTO program, to develop optical command link components for the fire control and guidance subsystems.
EXACTO项目的主承包商为Teledyne科技影像公司,该公司授权Cubic公司为火控制导子系统研发光学指挥链路组件。
The fire control software, jointly developed by Raytheon and THAAD prime contractor Lockheed Martin, also performed successfully, engaging the target complex and initializing the launch sequence.
火控软件是雷声公司与洛·马公司联合开发的,其测试也获得了成功,实现了初始化发射次序以及作战等功能。
Here are some drainage design components your landscape contractor can use to control and divert water.
以下是一些您的排水设计组件景观承包商可以用来控制和调水。
As a drive and control technology supplier, Bosch Rexroth also serves as the general contractor for unique turnkey projects throughout the world.
作为一家驱动和控制技术供应商,博世力士乐在全球也扮演着一些大型全承包项目的总承包商的角色。
Both the owner and the contractor must adopt some base line for cost control during the construction.
在施工过程中,业主和承包商都会有一个成本的基准来控制实际成本。
Your landscape designer can work with an electrical contractor to design simple, logical outdoor lighting control.
您的景观设计师可以与电业承办商,设计简单,合理的室外照明控制。
For the contractor, the bid estimate is usually regarded as the budget estimate, which will be used for control purposes as well as for planning construction financing.
对承包商来说,经常用投标估价作为预算,既可以进行成本控制,也可以进行施工期间的财务规划。
In order to ensure the installation quality, the contractor shall also control the quality as per the requirements as follows.
为保证安装质量,承包商还必须按如下要求进行质量控制。
The Contractor 's standard quality control procedures shall apply to the contract and Contractor' s standard works tests shall be performed.
供应方的标准质量控制程序应适用于合同,且应开展供应方的标准工作测试。
After this visual inspection, the free-issue materials shall come under the care, custody and control of the Contractor.
目视检查后,这些免费供应的材料应由承包商照管、监护和控制。
The Contractor must keep proper control over their storage and delivery of valuable demolished material.
承包方必须在存储和提供宝贵的拆卸材料保持适当的控制。
During the construction of embankments the Contractor shall control and direct constructional traffic uniformly over the full width.
在堤防建设的承包者应控制和直接施工交通均匀全宽。
In construction management of expressways, the contractor to the control goal of the project progress, the project costs and the project quality is playing a very important role.
在高速公路建设过程中,承包商对工程项目的进度、费用、质量控制目标起着至关重要的作用。
It is not only helpful of the client to control the whole process of design, but also helpful for the contractor to improve the design quality.
版次文件有助于业主实现对设计全过程的控制,有助于承包商提高设计质量。
In the third subsection, it is elaborated that EPC project is a comprehensive testing on the competence of contractor, success of EPC project depends on the control of risk source.
最后阐述EPC合同是对承包商能力的综合考验,EPC合同的执行成败取决于控制风险的源头。
Perform monitoring, inspection and quality control at in-house and sub-contractor steel fabrication and welding section .
在工厂内及分包商处监督并检查钢结构和焊接工作的质量。
The contractor may elect to holiday test on the day of application, using a lower voltage than specified in Section 6.0 of this specification, for his own control procedure.
承包商可以选择在涂敷日用低于本规范第6部分规定的电压来进行漏涂检查,按照他们自己的操作程序。
EPC contractor for more conducive to economic interests, so they are more attention in this mode of project cost control.
EPC模式有利于承包商获取更多的经济利益,因此他们也更关注在此模式下项目造价的控制。
The contractor also will handle urgent and depot repairs, inventory control, and spares management, the officials said.
官员说,承建商也将处理紧急的航空站的维修,库存控制和余下的管理工作。
The contractor also will handle urgent and depot repairs, inventory control, and spares management, the officials said.
官员说,承建商也将处理紧急的航空站的维修,库存控制和余下的管理工作。
应用推荐