The contract calls for Boeing to design, develop, manufacture and deliver 18 initial combat-ready tankers by 2017.
该合同要求波音公司到2017年设计、开发、制造和提供18架初始备战的加油机。
The contractor has made a quality assurance procedure also namely quality assurance document for the design, manufacture, installation and test of all the equipment and materials within the contract.
承包商已为合同范围内的所有设备、的设计、制造、安装、测试建立了一套质量保证程序即质量保证文件。
The contractor has made a quality assurance procedure also namely quality assurance document for the design, manufacture, installation and test of all the equipment and materials within the contract.
承包商已为合同范围内的所有设备、的设计、制造、安装、测试建立了一套质量保证程序即质量保证文件。
应用推荐