The prestress concrete continuous girder bridge is one of the most widely used in bridge engineering because of its excellent structural system.
预应力混凝土连续梁桥因其优越的结构体系成为当今一种广泛采用的桥梁形式。
The prestress design is the important part in the design of concrete continuous girder bridges.
预应力设计是混凝土连续梁桥设计中的重要组成部分。
Calculation method of simply supported to continuous girder bridge is analyzed and compared with load test.
目的探讨均布载荷作用下简支、连续梁桥体外力筋应力增量的简便计算方法。
Construction control of auxiliary channel continuous girder Bridges of Donghai bridge is briefly introduced.
对东海大桥辅通航孔连续梁桥的施工控制作了简要介绍。
One continuous girder footbridge is taken as the case, with some hazards occurring through many years' service.
某连续梁人行桥,经过多年的运营该桥部分出现了一些病害。
In this paper, prestressed concrete continuous girder bridge is studied by using finite element analysis tool with support project.
本文以预应力混凝土连续梁桥为研究对象,采用有限元分析手段结合依托工程进行研究。
A comparison of steel deck weights indicates that the cable-stayed bridge again fills the void between the continuous girder and suspension Bridges.
以上钢桥面重量的比较指出,斜拉桥介于连续梁和悬索桥之间。
The approach Bridges of Binzhou Huanghe River bridge are of prestressed concrete continuous girder structures used with C50 high performance concrete.
滨州黄河大桥引桥是预应力混凝土连续梁桥,采用C50高性能混凝土。
In this paper, for making the right engineering decision, use fuzzy comprehensive theory to evaluate the reliability of certain continuous girder bridge.
本文利用模糊综合理论来进行连续梁桥的可靠度评估,以便为工程决策做出正确的指导。
The geometrical alignment control for the construction of multi-span continuous girder Bridges with MSS (Movable Support System) has its own characteristics.
采用移动模架施工多跨连续梁时,线形控制有其自身的特点。
The influence of large deflection on the stress and displacement of the thin-walled box continuous girder with variable cross - sections depends on the load.
大挠度对变截面连续梁箱梁内力、位移的影响程度取决于荷载。
Uncertain factors in construction of continuous girder bridge such as side span joint scheme and different balanced cantilever construction speed are analyzed.
对施工中的不确定因素,诸如边跨合拢方案和不同桥墩悬浇进度不一致等进行了分析比较。
The hanging baskets are the main equipments in the cantilever casting construction of large-scale prestressed concrete continuous rigid bridge and continuous girder bridge.
挂篮是目前大跨径预应力混凝土连续刚构桥和连续梁桥在悬臂浇注施工时主要采用的施工设备。
Finite beam segment method is an effective way to solve the shear lag problem of statically indeterminate structure, such as continuous girder with constant cross section etc.
有限梁段法是求解超静定结构(如连续梁等)剪力滞行之有效的方法。
In this paper, the design of the long span asymmetric prestressed concrete curved continuous girder bridge, and static and dynamic load tests for the completed bridge are described.
介绍大跨度不对称曲线预应力混凝土连续梁桥的设计和成桥后的静、动载试验。
In this paper, the design of the long span asymmetric prestressed concrete curved continuous girder bridge, and static and dynamic load tests for the completed bridge are described.
介绍大跨度不对称曲线预应力混凝土连续梁桥的设计和成桥后的静、动载试验。
应用推荐