• Calculated from the measured data of continuous beams with shear lag effect of the actual situation, for the future bridge design and construction control of the scene to provide valuable information.

    现场实测数据计算分析连续剪力效应实际情况以后桥梁设计现场施工控制提供有价值资料

    youdao

  • The main spans of Hengshan Xiangjiang Bridge in Hunan are cable stayed bridge and continuous beams.

    湖南衡山湘江公路大桥主桥斜拉桥连续采用两岸双向顶推施工完成。

    youdao

  • The piers of the Bridge are of single-and double-column piers without capping beams and the concrete continuous box girders atop the piers are constructed by movable shuttering form.

    研究目的:解决自行式移动模架法现浇客运专线铁路大跨度、大吨位箱梁关键施工技术、施工工艺,以适应客运专线桥梁快速施工。

    youdao

  • The piers of the Bridge are of single-and double-column piers without capping beams and the concrete continuous box girders atop the piers are constructed by movable shuttering form.

    研究目的:解决自行式移动模架法现浇客运专线铁路大跨度、大吨位箱梁关键施工技术、施工工艺,以适应客运专线桥梁快速施工。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定