First, we must strengthen the construction of geographic information data sources, using 3 to 4 years time to achieve full coverage of the basic topographic maps.
一是要加强地理信息数据资源建设,利用3至4年时间实现基本地形图全覆盖。
The paper analyses the characteristics of enterprises information resources construction, and its development principle, then states the main channel of development and using it.
本文分析了企业信息资源建设的特点,及其开发的原则,阐述了企业信息资源开发利用的主要途径。
During the filling construction of the roadbed the total settlement value could be predicted by using time series equal interval prediction model of recent information.
在路基填筑施工过程中,根据沉降观测数据用时间序列分析方法建立等维信息动态预测模型。
In this paper the principles and methods of mechanical calculation models for tunnel was judged by using directly the information of displacement measurement in monitoring of tunnel construction.
本文研究了直接利用隧道施工监测的位移量测信息来判别隧道力学计算模型的原理和方法。
An incremental construction algorithm named PCCL of the constrained concept lattice was presented by using pruning technology that eliminated the redundant information in the construction process.
采用剪枝技术来消除构造过程中存在的冗余内涵比较,给出约束概念格渐进式构造算法PCCL。
Abstract: By using mailed questionnaires, this paper investigates the credit situation of China's construction market and the operational state of credit information platform.
[摘要]通过邮寄问卷的形式,对我国建筑市场的信用现状和诚信信息平台的运行状况进行了调查。
The building of information monitoring platform system has realized dynamic and fine management in the process of the approval, supplement, use, adding and check of construction using land.
构建信息系统监管平台,实现了建设用地审批、供地、利用、补充、检查全过程动态化、精细化管理。
This paper discusses the technique of using formal concept analysis in combination with data model and the data information for ontology construction.
文中探讨了运用形式概念分析的技术,结合数据库模式及其数据,构建本体的方法。
Using this method, we are accurately informed the rock structure in front of the face of tunneling and we may provide information for further construction.
通过该方法可及时、详细地了解开挖掌子面前方岩石结构情况,为施工单位合理安排施工进度和减少工程隐患提供依据。
Using this method, we are accurately informed the rock structure in front of the face of tunneling and we may provide information for further construction.
通过该方法可及时、详细地了解开挖掌子面前方岩石结构情况,为施工单位合理安排施工进度和减少工程隐患提供依据。
应用推荐