According to the result of 15 years monitoring, the deformation, seepage and stress-strain of the high slope and the navigation lock during construction and operation periods are analyzed.
根据15年的监测成果,对施工及运行期高边坡和船闸的变形、渗流和应力应变等进行分析。
The results of monitoring data show that the excess stress and structural defects are the direct causes for the crushing and breaking of horizontal construction joints.
监测资料分析结果表明:导致面板水平施工缝挤压破损的直接原因是面板水平缝缝面压应力过大和结构上的缺陷;
Based on the monitoring for expressway tunnel construction and finite element analysis, the paper analyzed the country rock stress state in the process of tunnel construction.
通过高速公路隧道施工监测及有限元数值分析方法,分析隧道施工过程中围岩应力变化情况。
The pre stress sensor is necessary for measurement in monitoring, research and test in the construction of anchors, pre stress concrete and pre stress Bridges.
预应力传感器是锚固工程、预应力混凝土工程、预应力桥梁工程等领域进行监测、研究与试验必不可少的测量用传感器。
The pre stress sensor is necessary for measurement in monitoring, research and test in the construction of anchors, pre stress concrete and pre stress Bridges.
预应力传感器是锚固工程、预应力混凝土工程、预应力桥梁工程等领域进行监测、研究与试验必不可少的测量用传感器。
应用推荐