Calculation results presented here show that the bridge is of enough wind stability under both under-construction state and completion state.
结果表明该桥无论是成桥状态还是施工状态均具有足够的抗风稳定性。
The structural analysis for perfectly finished state and reasonable construction state of cable-stayed bridge is the focal and key point of the design.
斜拉桥理想成桥状态与合理施工状态的结构分析是其设计的重点和难点。
Being asymmetric, it's more complex to determine the reasonable finished state and the reasonable construction state of the asymmetric cable-stayed bridge with single tower.
独塔不对称斜拉桥由于其不对称性,使得其合理成桥状态和合理施工状态的确定显得更为复杂。
Finally, the initial construction state and dead load state of Jiangyin Yangtze River Highway Bridge are calculated as a numerical example. It is shown that the initial construction sta...
运用该方法对江阴长江大桥进行了计算,计算结果表明:该方法能比较准确地计算出悬索桥施工理想初态和成桥状态。
Practice proves that the method for determining the construction state and construction control in the paper is rational.
实践证明,确定合理施工状态和施工控制的方法是合理的。
According to the special structure of precast block of inverted arch for TBM construction tunnel, the dynamic construction state is modeled by FEM with surrounding rock - structure calculating model.
针对TBM施工隧道仰拱预制块的特殊结构,采用围岩-结构模式,进行了模拟施工动态的受力影响计算分析。
According to the special structure of precast block of inverted arch for TBM construction tunnel, the dynamic construction state is modeled by FEM with surrounding rock - structure calculating model.
针对TBM施工隧道仰拱预制块的特殊结构,采用围岩-结构模式,进行了模拟施工动态的受力影响计算分析。
应用推荐