The tensioning of the cables is finished and the error is controlled in 5%, which verifies the correctness of the construction simulation.
钢索张拉顺利完成,最终误差控制在5%以内,证明了施工模拟分析的正确性。
In the Qing Jiang diversion tunnel of water power engineering, the bench cut method is applied and construction simulation is analysed.
清江水布垭导流洞具有复杂的工程环境,考虑工程各种不利因素确定采用台阶法施工,并对隧洞施工进行了数值模拟。
A concrete construction simulation and management system is developed for Danjiangkou Dam heightening project as part of median-line of south-to-north water transfer project in the paper.
以南水北调中线丹江口大坝加高工程为背景,开发了丹江口大坝加高工程混凝土浇筑施工模拟与管理系统。
After discussing existing methods of construction simulation, an ameliorated analysis method of cycle-forward is developed, which is based on the method of cycle-forward and ANSYS software.
在总结现有施工模拟方法的基础上,结合循环前进分析法和有限元软件Ansys,提出了改进的循环前进分析法。
After discussing existing methods of construction simulation, an ameliorated analysis method of cycle-forward is developed, which is based on the method of cycle-forward and ANSYS software.
在总结现有施工模拟方法的基础上,结合循环前进分析法和有限元软件Ansys,提出了改进的循环前进分析法。