The construction record controlled by digital prestress tension system and the comparison between calculated and tested values of prestressing loss in an actual project are discussed.
给出了实际工程应用中利用数字化张拉系统施工的控制过程记录,以及所测定的预应力损失值与理论计算值的对比。
The construction record controlled by digital prestress tension system and the comparison between calculated and tested values of prestressing loss in an actual project are discussed.
给出了实际工程应用中利用数字化张拉系统施工的控制过程记录,以及所测定的预应力损失值与理论计算值的对比。
应用推荐