A practical man-dug hole slippery-proof pile geological control project is taken to introduce the effective construction management and improvement of economic benefits.
结合一个实际的人工挖孔抗滑桩地质灾害治理项目,介绍了通过有效地加强施工管理,提高工程经济效益的工程案例。
A man walks past buildings under construction at a residential complex in Chongqing municipality, January 28, 2011.
图为2011年1月28日,一男子走过重庆一处正在施工中的住宅小区。
THE oldest company in the world is Kongo Gumi, a construction firm based in Osaka. It started building Buddhist shrines in 578AD, and was still run by a man surnamed Kongo 40 generations later.
世界上历史最悠久的企业金刚组(KongoGumi),是位于大阪的一家建筑公司,它从公元578年开始建造佛教庙宇,传了40代以后,现在仍然由一位金刚家族的男士打理。
WHEN a Bangladeshi man goes to work on a construction site in the Middle East, his wife typically moves in with her husband’s family.
当一名孟加拉男子在中东建筑工地上班时,他的妻子往往也与她丈夫的家人一起迁入(中东)。
An urban heat island is created when dark colored man-made materials used in the construction of a city absorb the sun's rays and release that energy back out as heat.
深色的人造建筑材料吸收太阳辐射,并将获取的能量以热量的形式释放出来,城市“热岛效应”随即产生。
While at Los Alamos, Carter observed the construction of the inner core of Fat Man.
在阿拉莫斯,卡特亲眼目睹了“胖子”核心部件的组装。
Digital city construction must be Man Land relationship central and information model driven, people database and Geo database are kernel databases of the Digital city.
“数字城市”的建设必须以人地关系为中心,信息模型为驱动,“人”的数据库与“地”的数据库是“数字城市”的核心数据库。
Service requirements in the current MAN are analyzed. Four kinds of solutions for the construction of MAN are put forward.
对当前城域网的业务需求进行了分析,提出四类城域网建设解决方案。
The essential concepts, network structure and programming principle of metropolitan area network (MAN) are introduced briefly. And the solution for MAN construction of China Railcom is discussed.
简要介绍了城域网的基本概念、网络结构、规划原则,并针对中国铁通城域网建设论述了解决方案。
Time-saving, highly effective, and reduces the labor intensity, basic may save man-hour of half, enhances labor productivity three times, is the outer wall construction most ideal equipment.
省时、高效,并且减轻劳动强度,基本可以节省工时一半,提高劳动生产率三倍,是外墙施工的最理想设备。
Other carpets and other floor coverings, not of pile construction, not made up, of man-made textile materials.
人造纺织材料制其它梭织地毯及其它覆地物,未具毛簇结构,尚未完成者。
And the current countryside landscape pattern is to be found in the essence of traditional "integration of the nature and man" in the period of the new countryside construction.
结合新农村建设的发展势头,试图从中发现可供我国当前乡村景观格局借鉴的传统“天人合融”的精神本质。
Other carpets and other floor coverings, woven, of pile construction, made up, of man-made textile materials.
人造纺织材料制其它梭织地毯及其它覆地物,具有毛簇结构,已完成者。
The principles for the construction of IP MAN of CTT's Shandong Branch were presented.
提出了山东铁通IP城域网组网建设的原则。
Other carpets and other floor coverings, woven, not of pile construction, made up, of man-made textile materials.
人造纺织材料制其它梭织地毯及其它覆地物,未具毛簇结构,已完成者。
The paper gives a deeply research to the construction of Dongying MAN through the certain project example.
本文通过具体的工程实例,对东营城域网的建设进行了比较深入的研究。
A construction worker was rushed to the hospital after cutting himself badly. The doctor told the nurse to prepare a painkiller. "Don't bother Doctor, "said the man.
一个伤痕累累的建筑工人冲进了一家医院,医生马上让护士去拿止痛药,“不必麻烦您了,医生。”
The artificial hole piles are one of most foundation types in the modern construction, The problems on water inflow and soil flow are most troublesome in the construction of hole piles dug by man.
人工挖孔桩是现代建筑的主要基础类型之一,而涌水和流沙是人工控孔桩施工中最棘手的问题。
It aims at the harmonious existence of the man and the nature, the man and the society and promotes the construction of modern morality from the dimension of the nature and the society.
其以人与自然、人与社会的和谐共生为旨归,从自然之维、社会之维等方面来推进现代性道德的建设。
The present paper gives a deeply research to the construction of Dongying MAN through the certain project example.
本论文通过具体的工程实例,对东营城域网的建设进行了比较深入的研究。
Joint utilization of strip foundation under wall with static press pile is a kind of design and construction plan which can reduce man-hours and building costs.
墙下条形基础与静压桩基结合使用,对于弱地基上的多层混合结构建筑是一种既能缩短工期,又能降低造价的设计、施工方案。
A man with an umbrella walks through steam rising from a construction site during a rain storm in New York.
纽约暴雨中,一名男子撑着伞走过蒸汽弥漫的建筑工地。
Many factors can cause lawn hollow and hole, such as soil terrene, construction technology or force majeure and man-made factors, in which soil terrene is the main and direct factor.
导致草坪凹陷、坑洼的因素是多方面的,有土壤土质因素、施工技术因素以及其他因素,如不可抗力和人为因素等,其中土壤土质因素为主要和直接因素。
Many factors can cause lawn hollow and hole, such as soil terrene, construction technology or force majeure and man-made factors, in which soil terrene is the main and direct factor.
导致草坪凹陷、坑洼的因素是多方面的,有土壤土质因素、施工技术因素以及其他因素,如不可抗力和人为因素等,其中土壤土质因素为主要和直接因素。
应用推荐