• A practical man-dug hole slippery-proof pile geological control project is taken to introduce the effective construction management and improvement of economic benefits.

    结合一个实际的人工挖抗滑桩地质灾害治理项目介绍了通过有效地加强施工管理提高工程经济效益工程案例。

    youdao

  • A man walks past buildings under construction at a residential complex in Chongqing municipality, January 28, 2011.

    图为2011年1月28日男子走过重庆一处正在施工中的住宅小区

    youdao

  • THE oldest company in the world is Kongo Gumi, a construction firm based in Osaka. It started building Buddhist shrines in 578AD, and was still run by a man surnamed Kongo 40 generations later.

    世界上历史最悠久的企业金刚组(KongoGumi),位于大阪的一家建筑公司公元578年开始建造佛教庙宇,传了40以后,现在仍然位金刚家族的男士打理。

    youdao

  • WHEN a Bangladeshi man goes to work on a construction site in the Middle East, his wife typically moves in with her husband’s family.

    孟加拉男子中东建筑工地上班时,妻子往往丈夫的家人一起迁入(中东)。

    youdao

  • An urban heat island is created when dark colored man-made materials used in the construction of a city absorb the sun's rays and release that energy back out as heat.

    深色人造建筑材料吸收太阳辐射将获取能量热量的形式释放出来城市热岛效应”随即产生

    youdao

  • While at Los Alamos, Carter observed the construction of the inner core of Fat Man.

    拉莫斯卡特亲眼目睹胖子核心部件组装。

    youdao

  • Digital city construction must be Man Land relationship central and information model driven, people database and Geo database are kernel databases of the Digital city.

    数字城市建设必须关系中心信息模型驱动,“”的数据库“地”的数据库“数字城市”的核心数据库

    youdao

  • Service requirements in the current MAN are analyzed. Four kinds of solutions for the construction of MAN are put forward.

    当前城域网业务需求进行了分析,提出城域网建设解决方案。

    youdao

  • The essential concepts, network structure and programming principle of metropolitan area network (MAN) are introduced briefly. And the solution for MAN construction of China Railcom is discussed.

    简要介绍城域网基本概念网络结构规划原则针对中国铁通城域网建设论述了解决方案。

    youdao

  • Time-saving, highly effective, and reduces the labor intensity, basic may save man-hour of half, enhances labor productivity three times, is the outer wall construction most ideal equipment.

    省时高效并且减轻劳动强度基本可以节省工时一半提高劳动生产率外墙施工理想设备

    youdao

  • Other carpets and other floor coverings, not of pile construction, not made up, of man-made textile materials.

    人造纺织材料其它梭织地毯其它地物,具毛簇结构,尚未完成者。

    youdao

  • And the current countryside landscape pattern is to be found in the essence of traditional "integration of the nature and man" in the period of the new countryside construction.

    结合农村建设发展势头,试图从中发现可供我国当前乡村景观格局借鉴传统天人合融”的精神本质

    youdao

  • Other carpets and other floor coverings, woven, of pile construction, made up, of man-made textile materials.

    人造纺织材料其它梭织地毯其它地物,具有毛簇结构,已完成者。

    youdao

  • The principles for the construction of IP MAN of CTT's Shandong Branch were presented.

    提出山东铁通IP城域网组网建设原则

    youdao

  • Other carpets and other floor coverings, woven, not of pile construction, made up, of man-made textile materials.

    人造纺织材料其它梭织地毯其它地物,具毛簇结构,已完成者。

    youdao

  • The paper gives a deeply research to the construction of Dongying MAN through the certain project example.

    本文通过具体工程实例,对东营城域网建设进行比较深入研究

    youdao

  • A construction worker was rushed to the hospital after cutting himself badly. The doctor told the nurse to prepare a painkiller. "Don't bother Doctor, "said the man.

    一个伤痕累累的建筑工人一家医院医生马上护士止痛药,“不必麻烦您了,医生。”

    youdao

  • The artificial hole piles are one of most foundation types in the modern construction, The problems on water inflow and soil flow are most troublesome in the construction of hole piles dug by man.

    人工现代建筑主要基础类型之一,而流沙是工控孔桩施工棘手问题

    youdao

  • It aims at the harmonious existence of the man and the nature, the man and the society and promotes the construction of modern morality from the dimension of the nature and the society.

    自然、人与社会和谐共生为旨归,自然之、社会之维等方面来推进现代性道德建设

    youdao

  • The present paper gives a deeply research to the construction of Dongying MAN through the certain project example.

    论文通过具体工程实例,对东营城域网建设进行比较深入研究

    youdao

  • Joint utilization of strip foundation under wall with static press pile is a kind of design and construction plan which can reduce man-hours and building costs.

    条形基础静压桩基结合使用,对于弱地基上多层混合结构建筑缩短工期,又能降低造价的设计、施工方案

    youdao

  • A man with an umbrella walks through steam rising from a construction site during a rain storm in New York.

    纽约暴雨一名男子撑着走过蒸汽弥漫建筑工地。

    youdao

  • Many factors can cause lawn hollow and hole, such as soil terrene, construction technology or force majeure and man-made factors, in which soil terrene is the main and direct factor.

    导致草坪凹陷、坑洼的因素多方面的,有土壤土质因素、施工技术因素以及其他因素,如不可抗力人为因素其中土壤土质因素主要直接因素。

    youdao

  • Many factors can cause lawn hollow and hole, such as soil terrene, construction technology or force majeure and man-made factors, in which soil terrene is the main and direct factor.

    导致草坪凹陷、坑洼的因素多方面的,有土壤土质因素、施工技术因素以及其他因素,如不可抗力人为因素其中土壤土质因素主要直接因素。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定