• The aggregate production systems at the Three Gorges project, should meet requirements for the concrete placement of stage -I works, with a huge volume and a long construction duration.

    三峡工程第二阶段混凝土浇筑量持续时间,混凝土骨料生产供应必须满足混凝土浇筑要求

    youdao

  • The magnitude of the load was affected by the construction duration. It is necessary to know the distribution of load and the construction duration when we design and construct such tunnels.

    衬砌荷载大小与其施筑时间有很大的关系,设计施工合理掌握二次衬砌所承担的荷载比例和以及施筑时间。

    youdao

  • During the construction phase, it is given big thought to prioritize to work with local manufacturers, builders, and workers to minimize the waste, maximize efficiency and construction duration.

    施工阶段这一点在于当地制造商工人合作得到了优先考虑尽量减少浪费最大限度地提高效率和缩短施工工期

    youdao

  • The aggregate supply systems for the Three Gorges Project (TGP) must meet the requirements for concrete works with such features as huge volume, high placement rate and long construction duration.

    三峡工程混凝土浇筑量,强度持续时间,砂石骨料生产必须满足混凝土浇筑要求

    youdao

  • It also gives a construction approach for approximating the probability density function of activity duration, which will facilitate the computer simulation of the PERT diagram.

    本文还给出了一种简练函数构造,用方法构造函数较好地逼近活动工期概率密度函数,方便了对计划网络计算机仿真运算

    youdao

  • First, the duration of construction is expected to be 30 working days, which is managed according to the provided conditions of the construction.

    第一工程预期30个工作日根据施工所具备条件以次类推

    youdao

  • The bridge construction process is the chance phenomenon. Working operation occurrence and its duration are the random probability distribution model too.

    桥梁施工过程一种随机现象工序发生持续时间亦随机概率分布模型。

    youdao

  • It is extremely easy to cause severe spoil loss because the duration of railway construction is relatively longer and spoils produced by construction are large in quantity and scattered.

    铁路工程建设施工期,工程建设产生分散极易造成严重的弃渣流失

    youdao

  • For complex engineering construction system, resource scheduling of limited project duration-resource leveling is an important and difficult problem.

    对于复杂工程施工系统工期一定、资源均衡资源进度计划需要解决的一个重要且有相当难度的问题。

    youdao

  • This paper described a small type drop-test shock machine with long duration of shock pulse. Thispaper analyzed its construction characters, operation principle and wave forms of shock test.

    介绍一种脉冲持续时间小型跌落冲击结构特点工作原理、冲击试验波形进行阐述分析

    youdao

  • As compared with common power materials, materials for electric power capital construction are characterized by use for a given project, press of time, short duration in storage, etc.

    电力基建物资一般电力物资相比具有次专用性强、时间要求快、库存时间等特点。

    youdao

  • Abstract: The influencing factors of the source of construction project duration extension are complicated.

    [摘要]建设工程项目工程延期影响因素错综复杂

    youdao

  • Our company focus on technical training of staff, and we have a professional construction team to ensure the safety, quality and duration of construction.

    公司注重员工技术培训拥有一支专业精干的施工队伍保证施工的安全质量工期。

    youdao

  • Our company focus on technical training of staff, and we have a professional construction team to ensure the safety, quality and duration of construction.

    公司注重员工技术培训拥有一支专业精干的施工队伍保证施工的安全质量工期。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定