WAA was lead consultant for the development of the concept, research, coordination, overall and detail design, construction documents and resident supervision.
WAA是领头设计顾问,负责概念、研究、协调、整体和详细设计,施工文件和现场监督。
This paper introduces the principles of filling the Numbers of construction materials, the quality requirements of files and the establishing principles and methods of construction documents.
介绍了施工资料的编号填写原则、组卷文件的质量要求、施工文件的立卷原则及方法。
It is the owners' responsibility to ensure that this information is incorporated into the Construction Documents.
业主有责任确保将这一信息包含在施工文件中。
BA sed on approved Design Development the executive architect or general contractor will produce the Construction Documents.
总建筑师或者总承包人将在已审定的初步设计的基础上编制施工图文件。
BA sed on approved Design Development the executive architect or general contractor will produce the Construction Documents.
总建筑师或者总承包人将在已审定的初步设计的基础上编制施工图文件。
应用推荐