As of the costs caused by earthquake or flood during construction, four kinds of losses are considered, they are: economic losses, casualties, construction delay and environmental impact.
针对施工期地震或洪水发生时可能造成的损失,本文从经济损失、人员伤亡、工期延误、环境影响四个方面进行了考虑。
Such renegotiation could jeopardize federal funding and delay construction, but the needless haste created by Washington's arbitrary deadlines have resulted in mistakes that could be extremely costly.
这样的谈判或许会让联邦基金更加捉襟见肘,也可能会延迟建设,但是华盛顿恣意定下的死线造成了没有必要的犹豫,而这种犹豫所导致的错误或许更加昂贵。
The state safety standards on construction projects which can not ensure the safety of buildings shall be amended without delay.
有关建筑工程安全的国家标准不能适应确保建筑安全的要求时,应当及时修订。
Delay of commencement or completion for matching with other important national or local construction projects.
因配合国家或地方其他重大建设需要,致须延后开工或延长完工时程者。
When State standards for construction safety fail to meet the requirements for ensuring such safety, they shall be revised without delay.
有关建筑工程安全的国家标准不能适应确保建筑安全的要求时,应当及时修订。
Project delay is a common problem in the world construction industry today. For the construction of engineering project in our country, this problem is especially outstanding.
工期延误问题是当今世界建筑业中普遍存在的问题,对于国内工程项目建设而言,这个问题尤为突出。
In project construction contracts, there aren't clear agreements on the composition and calculation of Liquidated Damages for Delay at present, which have brought many difficulties.
目前工程施工合同对误期损害赔偿的构成和计算的约定不够明确,给工程实施带来了很多困难。
During the long period, It is believed that the mainly reason is the engineering change which results in schedule delay and cost overruns of the construction project.
在这个较长的建设周期内,工程变更被认为是导致项目工期延迟和费用超支的主要原因,在工程建设项目管理过程中倍受重视。
A. m evaluates delay influence on construction time by analyzing the difference between the network before delay occurrence and the network after delay occurrence.
该方法通过对某一施工延误发生前后网络状态差异的分析,来评定该延误对总工期的影响。
At early time, it infrastructure construction concentrated on it metrics exclusively, such as it service availability, delay, jitter and so on.
早期的IT基础设施建设过程完全以技术标准核心,比如只考虑IT服务的可用性、时延、抖动等方面。
The contractor shall take his responsibility for the accidents caused by disobeying the safety regulations and shall neither increase the owner's cost nor delay the construction progress.
承包商应对因违反安全规程造成的责任事故承担责任,而不应为此增加业主支付费用或延迟施工进度。
Establish at least 2 times night meeting per week, find out reasons of delay construction process schedule, and take effective measures.
建立每星期晚上至少2次例会制度,找出拖延施工进度计划的原因,并采取相应的有效措施。
We have allowed that the necessary plant, equipment and Labour is available in close proximity to commence work, with minimal delay or construction ramping.
我们已允许必要的厂房,设备和劳动力,可在近距离展开工作,并且最大限度地延误或施工慢。
Discuss the three aspets of the logical-level simulation theory of digital circuits: the construction of delay model and multi-state model, simulation algorithms, and methods of component computation.
讨论了数字电路的逻辑级模拟中元件传输延迟模型、元件状态值模型的建立,逻辑模拟的算法以及元件计算的方法。
Abstract: The dispute of liquidated damage for delay (LAD) is not uncommon in construction and engineering.
[摘要]有关逾期违约金争议是较为常见的工程施工合同争议类型。
The object of claim for extension of time is to extend the construction time, to avoid the penalty for delay, and then provide the contract foundation for legality of financial claim.
工期索赔的目的首先是延长工期,避免遭受工期延误罚款;其次是给经济索赔的合法性奠定合同基础。
Several design methods and their experimental results are introduced. Design of acoustic cascade is firstly put up, which is effectively used in 1024 bits long delay time SAWTDL construction.
介绍了1024位声表面波抽头延迟线(SAWTDL)的几种设计结构及试验结果。其中声学级联结构为首次提出,是解决高位、长时延SAWTDL设计的行之有效的结构。
Meanwhile, due to a lack of flexible course structure brings stiffness and delay to the construction of courses.
同时由于缺乏灵活可变的课程结构,使得在课程在构建形式上显得呆板和滞后。
Consequently, the thick filling does not consolidate in the following process of construction, which results in the delay of completing.
在后续施工过程中,随着路基高度的增加路基不再被压密,导致固结过程所需的时间延长,工期滞后。
Not only delay the construction and engineering caused not due to the loss and waste, the impact engineering economic and social benefits.
不仅拖延了工期而且给工程造成了不应有的损失和浪费,影响了工程的经济效益和社会效益。
Design of acoustic cascade is firstly put up, which is effectively used in 1024 bits long delay time SAWTDL construction.
其中声学级联结构为首次提出,是解决高位、长时延sawtdl设计的行之有效的结构。
The third chapter presents a structural study of Hamlet and The Spanish Tragedy, and finds that Shakespeare's plot construction and treatment of space and mind intensify the effect of delay in Hamlet.
第三章将《哈姆雷特》与《西班牙悲剧》做了比较,发现尽管两剧相似处甚多,但是前者中情节设置、对空间和心理的独特处理方式使《哈姆雷特》的延宕更能激起受众的强烈心理感受。
The third chapter presents a structural study of Hamlet and The Spanish Tragedy, and finds that Shakespeare's plot construction and treatment of space and mind intensify the effect of delay in Hamlet.
第三章将《哈姆雷特》与《西班牙悲剧》做了比较,发现尽管两剧相似处甚多,但是前者中情节设置、对空间和心理的独特处理方式使《哈姆雷特》的延宕更能激起受众的强烈心理感受。
应用推荐