• Shaping project direction based on lessons learned from actual construction and testing of executable code.

    根据从可执行代码的实际构建和测试中得来的经验(重新)制定项目方向。

    youdao

  • Thus the acoustic quality of gym must be controlled by stages of planning, design, construction and testing.

    为保证体育场馆的声学质量,应从规划设计、施工、检验阶段加以控制。

    youdao

  • Design of high pressure rotating spouting pile, application and study of construction and testing methods are mainly discussed.

    重点论述了高压旋喷桩的设计、施工及检测方法的应用与研究。

    youdao

  • Based on a project practice, the article discusses some problems about Piles Dry Jet Mixing Method in the design; construction and testing. Finally it gives some Appraisements.

    本文根据工程实例,讨论了粉喷桩设计、施工、检测等过程中相关问题,并给出相应的评价。

    youdao

  • Based on a project practice, the article discusses some problems about Piles Dry Jet Mixing Method in the design; construction and testing. Finally it gives some Appraisements.

    本文根据工程实例,讨论了粉喷桩设计、施工、检测等过程中相关问题,并给出相应的评价。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定