Based on qualitative and quantitative temporal constraint and their converting rules, project implement process network is converted into temporal constraint net.
在定性时间约束和定量时间约束及其转换规则的基础上,实现了从项目实施过程网络到时间约束网络的转换。
Based on qualitative and quantitative temporal constraint and their converting rules, project implement process network is converted into temporal constraint network.
在定性时间约束和定量时间约束及其转换规则的基础上,实现了从项目实施过程网络到时间约束网络的转换。
Based on qualitative and quantitative temporal constraint and then-converting rules, project implement process network was converted into temporal constraint network.
在定性时间约束和定量时间约束及其转换规则的基础上,实现了从项目实施过程网络到时间约束网络的转换。
A system of evaluation criteria, namely the expert authority vector, object vector, constraint vector, object matrix and constraint matrix is put forward for project appraisal in conceptual design.
首次提出并建立了用于产品设计方案评价的专家权向量、目标向量、约束向量、方案评价的目标矩阵和约束矩阵。
A system of evaluation criteria, namely the expert authority vector, object vector, constraint vector, object matrix and constraint matrix is put forward for project appraisal in conceptual design.
首次提出并建立了用于产品设计方案评价的专家权向量、目标向量、约束向量、方案评价的目标矩阵和约束矩阵。
应用推荐