• While calculating the thermal stress, the influence of concreting time and the arrangement of post-pouring belt on the thermal stress should be considered.

    温度应力计算时应考虑混凝土浇筑时间的不同、后浇带的设置对温度应力的影响。

    youdao

  • The testing method of acquiring the data guide lines is based on provision of GB8076-1997 including bleeding rate, slump, concreting time. ratio of compressive strength. shrinkage rate and so on.

    获得数据指标的试验方法是根据GB8076- 1997规定试验方法,包括:泌水率、坍落度、凝结时间差、抗压强度比、收缩率等。

    youdao

  • The testing method of acquiring the data guide lines is based on provision of GB8076-1997 including bleeding rate, slump, concreting time. ratio of compressive strength. shrinkage rate and so on.

    获得数据指标的试验方法是根据GB8076- 1997规定试验方法,包括:泌水率、坍落度、凝结时间差、抗压强度比、收缩率等。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定