• Given the testing methodology described earlier, let's look at the concrete testing results.

    给出了前面所描述的测试方法,让我们看一下具体的测试结果。

    youdao

  • Being related to the first assembled monolithic precast concrete testing-building in our country, the loading experimental study is introduced on assembled monolithic composite continuous slab.

    结合国内首栋预制装配整体式混凝土结构试验楼工程,对装配整体式叠合连续楼板进行现场加载试验研究。

    youdao

  • The second part particularly elaborates and analyzes the object of water-turbine generator set's state monitoring, the concrete testing content and the common method applied to the failure diagnosis.

    第二部分详细阐述并分析水轮发电机组状态监测的对象和具体检测内容以及故障诊断的常用方法。

    youdao

  • The second part particularly elaborates and analyzes the object of water-turbine generator set's state monitoring, the concrete testing content and the common method applied to the failure diagnosis.

    第二部分详细阐述并分析水轮发电机组状态监测的对象和具体检测内容以及故障诊断的常用方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定