The tunnel deepening for 1 meter takes one day. Three days more - for concrete casting of the walls and the arch.
隧道加深一米需要1天的时间,而浇铸混凝土墙壁和拱顶需要3天多的时间。
And steel member placement, steel bar tying, concrete casting is critical to the quality of steel skeleton concrete structure.
钢构件安装精度控制、钢筋绑扎及混凝土浇筑是钢骨混凝土结构质量保证的关键。
The article mainly introduces concrete casting process and manner of the ultra-high formwork-supported structure with heavy load.
文章主要介绍了超高重荷模板支撑体系的结构混凝土浇筑施工工艺及方法。
The technique using reinforced concrete casting with GRP panels (Glass reinforced plastic) was employed to create the smooth curvilinear structure.
这个平滑的曲线结构采用了钢筋混凝土浇注玻璃钢面板的技术。
This paper introduces the application situation and application results of MNC-A3 high-performance early strengthening agent in concrete casting works of a certain housing estate.
介绍了MNC - A 3高效早强剂在某小区混凝土浇筑工程中的应用状况及应用效果。
The box girder concrete casting key point, layout of equipment and casting time control are analyzed on the base of construction performance of high quality maritime works concrete.
在研究高性能海工混凝土的施工性能的基础上,分析了箱梁混凝土浇筑关键点、设备配置和浇筑时间控制等。
The box girder concrete casting key point, layout of equipment and casting time control are analyzed on the base of construction performance of high quality maritime works concrete.
在研究高性能海工混凝土的施工性能的基础上,分析了箱梁混凝土浇筑关键点、设备配置和浇筑时间控制等。
应用推荐