General 3d coalfield seismic interpretation commonly USES kinematics information in time domain, and it is not suitable for complex geology condition.
常规的煤田三维地震解释以时间域运动学信息为主,适用于地质条件不太复杂的情况。
This article recounts how to select and establish the Pressure layer of pile, pile length, enlarged bottom diam - eter and so on in complex geology condition.
叙述在复杂地质条件下,如何选定桩的持力层、桩长和(?)底直径等问题。
Xuehu coal main and subsidiary well have deep shaft, thick surface soil and strong disability, poor pourability in the hydrated grope rock and complex geology condition.
薛湖煤矿主、副井井筒井深、表土厚且膨胀性强、基岩含水层可注性差、地质条件复杂。
Aimed at complex geology condition and requirements of big and concentive loading structure on upper part for foundation, drilled cast piles foundation is selected through comprehensive analysis.
针对复杂的地质条件和上部大而集中的荷载结构对基础的要求,通过综合技术分析,选用了挖孔灌注桩基础。
Compaction complex foundation treatment may obviously improve engineering geology condition of building site, raise bearing capacity, and lower grade of liquefaction.
挤密型复合地基处理,可以明显改善建筑场地的工程地质性能,提高承载力,降低液化等级。
Compaction complex foundation treatment may obviously improve engineering geology condition of building site, raise bearing capacity, and lower grade of liquefaction.
挤密型复合地基处理,可以明显改善建筑场地的工程地质性能,提高承载力,降低液化等级。
应用推荐