Estimated Completion Time: 60-90 minutes.
预计完成时间:60- 90分钟。
Minimize the total weighted completion time single machine scheduling problems.
最小化加权总完工时间的单机排序问题。
The completion time of the execution cycle determines how fast data is processed.
执行周期的完成时问决定了数据处理速度的快漫。
It is demonstrated that algorithm can reduce the completion time of the parallel program.
研究表明该算法能减少此类并行程序的完成时间。
The only function of a successive adjustor is to adjust the completion time of its corresponding starting activity.
唯一的作用是连续调节,是调整工作的完成时间,其相应的启动活动。
First drives an expression of expected completion time in order to get the equivalent form of the objective function.
为了得到目标函数的等价形式,首先导出期望完工时间的一个表达式。
Upon completion time and date Settings, LCD screen will automatically display the corresponding calendar weeks and month.
时间及日期设置完成后,LCD显示屏会自动显示对应的星期以及当月挂历。
We have our own factory in China to carry out daily product inspection strictly in order to guarantee the completion time.
本公司于国内自设厂房,每天均严格检测产品,并且保证出货时间准确,欢迎订造批发。
Achieve and maintain the response times, and work completion time frames, required to meet production and process requirements.
及时的响应设备维修要求,并在既定的计划内完成工作,满足生产和工艺的要求。
The improvement method for reduction of queue length was presented with emphasis on reducing the fluctuation of task completion time.
重点在减小任务完成时间的波动等方面,给出了减小队列长度的改进方法。
ECS USES a processor's dynamic voltage scaling (DVS) capability to map computational tasks to minimise completion time and energy use.
ECS使用处理器的动态电压调度(DVS)功能镜像计算任务以最大限度减少完成时间和能源使用。
We now have a progress bar, very similar to the default one , that also shows the estimated completion time and how much time is remaining.
就是这样。我们现在有一个进度条,非常类似默认的,这也说明预计完成时间和多少时间剩余。
The rewards and difficulty levels for the Missions of the Day have changed according to the completion difficulty level and completion time.
每日任务的奖励和难度等级按照完成的难度和完成时间变更。
Each ARM event reported to the DCI contains information about the start time and completion time of the ARM transaction, in addition to metadata.
每个报告给DCI的事件都包含ARM事务启动和完成时间的信息,这些信息添加到元数据中。
So, as the number of database users on an R4 server increased, so did the number of transactions as well as the average transaction completion time.
因此,随着R4服务器上数据库用户数的增多,事务数以及完成事务的平均时间也将增加。
The objective is to determine the optimal due-date and schedule simultaneously to minimize the completion time, earliness and tardiness penalties.
目标函数是使完工时间,提前完工时间和误工时间的加权和最小。
Uncertainty factors of a project construct process which includes randomicity and fuzziness affect the evaluation of project completion time greatly.
项目建设过程中的不确定性因素对预测项目完工时间有较大影响,项目中的不确定性主要是随机性和模糊性。
This method may use in revision and perfection of quota in completion time of project, and use in the decision and management of completion time of...
此方法可应用于工程项目建设工期定额的修订与完善,以及建设工期定额的执行和建设工期的决策与管理。
It collect data of completion time of exercise via computer , so the evaluation result is more objective and more accurate than in traditional methods.
评价系统通过计算机控制习题练习完成时间,产生的评价结论将比传统方法更客观、更准确。
This paper discusses the stochastic scheduling on a single machine to minimize total weighted completion time subject to precedence constraints of chains.
研究具有链式约束的单机随机排序问题,目标函数为加权总完工时间的数学期望。
This method may use in revision and perfection of quota in completion time of project, and use in the decision and management of completion time of project.
此方法可应用于工程项目建设工期定额的修订与完善,以及建设工期定额的执行和建设工期的决策与管理。
The paper studies the schedule problem of cross docking distribution in the situation of two machines, which objective function is the total weighted completion time.
主要研究两台机器环境下的以加权完工时间和为目标函数的越库调度问题。
The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).
考虑并行批加工机上不同尺寸工件的调度问题;目标是极小化最大完工时间。
The membership functions of fuzzy due dates represented by triangle numbers are employed to compare the completion time and due dates and to decide whether jobs are tardy .
为了便于计算,用三角形模糊数表示模糊交货期,本文用模糊交货期的隶属函数来比较任务的完工时间和交货期,判断任务是否误工。
The membership functions of fuzzy due dates represented by triangle numbers are employed to compare the completion time and due dates and to decide whether jobs are tardy .
为了便于计算,用三角形模糊数表示模糊交货期,本文用模糊交货期的隶属函数来比较任务的完工时间和交货期,判断任务是否误工。
应用推荐