Upon completion of the review and down select process, finalists will present information on their technologies and organizations to a panel of experts for further evaluation.
评审完成以后,全体选手将向专家们提供其技术的信息以作进一步的评估。
To carry out safety production standardization review of 30 metallurgical industry and trade enterprises, the completion of 10 Small and micro businesses standard evaluation work.
力争对30家冶金等工贸企业开展安全生产标准化复评,完成10家小微企业标准化达标评定工作。
Upon completion of construction, he must submit a project description outlining the LEED design features incorporated into the building for formal USGBC evaluation.
工程完工后,业主必须提交有关工程采用LEED设计要求的概况描述并申请美国绿色建筑委员会(usgbc)进行评估。
Report of quality evaluation for unit project is a important content in supervision works and it is also a important part in completion acceptance information.
单位工程质量评估报告是一项重要的监理工作内容,也是竣工报验资料的重要组成部分。
Performance appraisal is the work of the Organization of managers at all levels through the means of some of its lower completion of the work of the quantitative and qualitative evaluation process.
工作绩效考核就是组织各级管理者通过某种手段对其下层的工作完成情况进行定量与定性评价的过程。
After the completion of the third party information system test, business units should complete the information system security level protection filing and evaluation of rectification work.
信息系统第三方测试完成后,业务单位应完成信息系统安全等级保护备案和测评整改工作。
Inaccurate reservoir validity evaluation would mislead perforating, testing for oil and entire completion job.
没有准确的储层有效性评价,最终将会误导射孔、试油及整个完井工作。
In the study of volcanic gas reservoir, different completion way production methods evaluation model, in order to avoid the complexity of the numerical simulation of semi-analytical approach.
在研究火山岩气藏不同完井方式产能评价模型时,为了避免数值模拟的复杂性而采用半解析的方法。
This article use the Green function and the source function to derive volcanic gas reservoir the open hole completion productivity methods evaluation model.
本文采用格林函数和源函数方法推导出火山岩气藏裸眼完井产能评价模型。
Performance evaluation is one of the three pillars of the modern enterprises' control systems and it is one of the key systems for completion enterprise strategic and creation value.
业绩评价是现代公司控制体系的三大支柱之一,是完成企业战略、创造企业价值的关键制度之一。
Uncertainty factors of a project construct process which includes randomicity and fuzziness affect the evaluation of project completion time greatly.
项目建设过程中的不确定性因素对预测项目完工时间有较大影响,项目中的不确定性主要是随机性和模糊性。
Refers to the collective performance of the collective members of the collective capacity of the judgement or the completion of the upcoming work of the collective capacity of the evaluation.
集体效能指的是集体成员对集体能力的判断或对完成即将到来的工作的集体能力的评价。
It collect data of completion time of exercise via computer , so the evaluation result is more objective and more accurate than in traditional methods.
评价系统通过计算机控制习题练习完成时间,产生的评价结论将比传统方法更客观、更准确。
The report shall be written after the completion of self-inspection, and it shall include the results of self-inspection, conclusions of evaluation as well as improvement measures and suggestions.
自检完成后应形成自检报告,内容包括自检的结果、评价的结论以及改进措施和建议。
Abstract: Construction engineering Technic material is the completion of the project completion and acceptance of the important basis of quality grade evaluation.
摘要:建筑工程施工技术资料是工程完成后竣工验收评定质量等级时的重要依据。
SPECTRUM Diagnostic Services utilizes coiled-tubing-conveyed, fiber-optic distributed sensing for real-time evaluation of completion and production effectiveness.
SPECTRUM诊断服务采用连续油管传输的分布式光纤感应系统来实时评估完井和生产效果。
According to the above results, the perforation completion production evaluation software was developed, and the utility model patent was declared.
根据以上研究成果,开发了用于射孔完井产能优化与预测的软件,并申报了实用新型专利。
All these study results provided the theory basis for the optimization and evaluation of the oil and gas reservoir completion productivity.
这些研究成果为油气藏射孔完井产能优化设计和预测提供了理论依据。
Through the open hole completion productivity evaluation model, respectively derive perforated completion and slotted completion productivity evaluation models.
在裸眼完井产能评价模型的基础上进一步推导出火山岩气藏射孔完井和割缝衬管完井产能评价模型。
It operates in two segments, Completion and Production, and Drilling and Evaluation.
它的工作分两个部分,完井和生产,钻井和评价。
Therefore, in many areas the tender books, the evaluation is the key link, it has a bearing on the procurement of books is the successful completion of tasks.
因此在图书招标的多个环节中,评标是关键环节,它关系到图书采购任务是否顺利完成。
Synthesis and evaluation of the small cation polymer used in completion fluid;
对于阳离子聚合物的制备 ,分成两部分进行了简单综述。
Synthesis and evaluation of the small cation polymer used in completion fluid;
对于阳离子聚合物的制备 ,分成两部分进行了简单综述。
应用推荐