• The hydraulic computation and analysis at the closure of the reservoir dike is important to the construction of the project in the Yangtze estuary.

    水库围堤龙口水力计算水力条件分析龙口施工设计研究关键技术之一。

    youdao

  • The results from the self propelled ship model show that the final construction arrangement of river closure and the dike advancing sequences and ways could meet the requirements of navigation design.

    航船试验成果表明最终付诸实施大江截流施工布置以及进占程序方式可以满足通航设计要求

    youdao

  • The results from the self propelled ship model show that the final construction arrangement of river closure and the dike advancing sequences and ways could meet the requirements of navigation design.

    航船试验成果表明最终付诸实施大江截流施工布置以及进占程序方式可以满足通航设计要求

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定