I did find, however, that a full scan on my standard clean test system took nearly an hour with NIS 2008, almost twice as long as that of NIS 2007.
不过,我确实发现了一个问题:在我的标准的干净的测试系统中,执行一次完整系统扫描需要将近一个小时,这差不多是NIS 2007的两倍。
A combined power filter test system is designed, which is used to clean up harmonics of harmonic load.
设计的一套实验系统用来消除谐波负载产生的谐波影响。
The clean water test and start-up experiment results show that the system is efficient for nutrients removal.
清水和启动试验表明,该系统可有效去除污染物。
The clean water test and start-up experiment results show that the system is efficient for nutrients removal.
清水和启动试验表明,该系统可有效去除污染物。
应用推荐