• In order to confirm the construction parameters, the experiment of high pressure grouting in the clay central core was carried.

    为此,进行了粘土心墙内高压摆喷灌浆试验,以确定施工参数。

    youdao

  • Hexi Reservoir Project, applying filter design, is introduced, which is made up of clay central core and sandy gravel dam according to the gradation curve of clay and gravel.

    介绍了合溪水库工程的概况,选用坝型为粘土心墙砂砾石坝,根据粘土和砂砾石料场的颗分曲线,对反滤料进行了设计。

    youdao

  • Hexi Reservoir Project, applying filter design, is introduced, which is made up of clay central core and sandy gravel dam according to the gradation curve of clay and gravel.

    介绍了合溪水库工程的概况,选用坝型为粘土心墙砂砾石坝,根据粘土和砂砾石料场的颗分曲线,对反滤料进行了设计。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定