This model was examined with the changing of the length column packed Laojunmiao reservoir sand as well as the changing of flow volume injected flooding solution.
通过改变柱长和注入体积流量对所建立的模型进行了实验验证。
A mathematical model for calculating the additional load on casing because of temperature changing during testing and production operation in HPHT well is established.
建立了高温高压油气井测试、采油等作业中因井筒温度发生变化导致的套管附加载荷计算模型。
A mathematical model for calculating the additional load on casing because of temperature changing during testing and production operation in HPHT well is established.
建立了高温高压油气井测试、采油等作业中因井筒温度发生变化导致的套管附加载荷计算模型。
应用推荐