Once the tests have been passed the change set is pushed to the main branch.
只要测试通过,修改的部分就可以推送到主分支。
The user decides when one change set is complete, and when to start a new one.
用户将决定何时完成一个更改集,以及何时开始新的更改集。
In fact, it is the same change set we saw above as incoming in the Pending Changes view.
事实上,这就是我们前面在Pending Changes视图中看到的同一个传入更改集。
The changes you make will be collected into a change set associated with this work item.
您做出的变更将收集到一个与该工作项关联的变更集中。
Specify the name and description for the new change set, as shown in Figure 14, and click OK.
为新的变更集指定名称和描述,如图14所示,然后单击ok。
This section covers some additional ways to make the association between a work item and a change set.
本部分将介绍一些在工作项和更改集之间建立关联的附加方法。
Now you can see both this new change set and also the one that was suspended in the Pending Changes view.
现在可以在Pending Changes视图中同时看到这个新的更改集和挂起的更改集。
Conflicts can appear after accepting a change set from a work item or another workspace's or stream's history.
当从工作项或另一个工作区的或流的历史中接受变更集之后,可能出现冲突。
The change management tool reads the change set list and performs an automated merge on the recorded change set.
这个变更管理工具读取了变更组合列表,并在记录的变更组合中执行了合并过程。
Once you activate a task, a change set for the task is added and then displayed in the Synchronize view (see Figure 7).
一旦激活一项任务,该任务的更改集即被添加,并随后显示在Synchronize视图(见图7)中。
If you have changes and deactivate a task, the change set persists, allowing you to work with multiple outgoing changes concurrently.
如果有了更改,但任务停用,更改集不变,使您可以同时操作多项传出更改。
Figure 6 shows the Pending Changes view after Bill suspends his change set that is in potential conflict with Markus's incoming change set.
图6显示了当Bill悬挂了与Markus引入的变更集有潜在冲突的变更集之后的Pending Changes视图。
Incoming changes made by team members show up grouped by task, and you can right-click an incoming change set to open the corresponding task.
由团队成员做出的更改按照任务分组显示,可以通过右键单击一个引入的更改集来打开相应的任务。
Team Central view gives you a quick overview of information that is relevant for your work, including builds, work item activity, or change set deliveries.
团队控制台(TeamCentral)视图为您提供与您的工作相关的信息的简要概述,包括构建、工作项活动或变更集交付。
Instead, he will suspend his change set, deliver a fix for the critical bug, and then resume his original change set to continue what he was doing before.
相反,他将挂起自己的更改,交付该关键错误的修复,然后恢复原先的更改集以继续进行先前所做的更改。
A change set is a built-in Eclipse facility for grouping resources. You operate on it in the Synchronize view for the purpose of committing, updating, or creating patches.
更改集是一项用于对资源分组的内置的Eclipse工具,可以在Synchronize视图中对其进行操作,以提交、更新或创建补丁。
Merely tagging change sets with task Numbers isn't enough; one has to be able to say "merge feature X into branch y" and have the source control identify every change set that is needed.
仅仅给变更打上任务号是不够的,成员必须要说明“将功能X合并入分支y”,并让版本控制系统识别所有需要的变更。
The new files created since the last check-in, as well as any existing files that have been modified, will be associated with this activity, and will be recorded in the activity's change set.
在最后的检入时创建的新文件,还有已经被修改的任何已有文件,将会被关联到此活动,并且会被记录在活动的变更集中。
The Pending Changes view displays the sets of change sets that comprise an incoming or outgoing baseline, and the user can also compare baselines to see the change set differences between them.
Pending Changes视图显示了包括传入和传出基准的更改集集合,并且用户可以比较基准以确定基准之间的更改集差异。
If you have a work item open, you can associate it with a change set by dragging the work item number shown at the top of the work item to Pending Changes, and dropping it on your change set there.
如果已打开了某个工作项,可以通过将该工作项顶部显示的工作项编号拖拽到PendingChanges,并将其放在那里的更改集上,从而将其与该更改集关联起来。
You can use the context menu on the view's Change Set node to override, commit, or create a patch.
可以使用位于视图的Change Set节点的上下文菜单来覆盖、提交或创建一个补丁。
The "Change Set Comment" textbox offers a place for me to type an explanation of what I changed and why I did it.
“变更集合注释”提供了一个地方来解释我变更过什么,为什么变更。
This permits the node with the largest change-set to continue but means that changes to one host will be lost.
这使得最大变更集合的节点可以继续工作,但也意味着一个主机上的变更将丢失。
This permits the node with the largest change-set to continue but means that changes to one host will be lost.
这使得最大变更集合的节点可以继续工作,但也意味着一个主机上的变更将丢失。
应用推荐