• It includes change control on the environment configuration, applications, and infrastructure.

    它包括对环境配置、应用程序和基础设施的更改控制。

    youdao

  • A prerequisite to any change control process is an up to date inventory of hardware and software.

    任何更改控制流程的先决条件都需要有最新的硬件和软件库存。

    youdao

  • Instead someone on the change control team is responsible for pulling features into the main branch.

    相反,变更控制团队的人负责将功能拉入到主干中。

    youdao

  • The larger the environment, the more impact change control has on the success or failure of that environment.

    环境越大,更改控制对该环境的成功或失败的影响也越大。

    youdao

  • Another aspect of change control, in some systems, is the ability to keep track of the status of each change.

    在一些系统中,变化控制的另一个方面是跟踪每个变化的状态的能力。

    youdao

  • In most application areas the change control system is a subset of the configuration management system.

    在大多数应用领域,变更控制制度是配置管理制度的一个组成部分。

    youdao

  • Influencing the factors that circumvent integrated change control so that only approved changes are implemented.

    对妨碍整体变更控制的因素施加影响,保证只实施经过批准的变更。

    youdao

  • Influencing the factors that could circumvent integrated change control so only approved changes are implemented.

    对妨碍整体变更控制的因素施加影响,以做到仅实施经过批准的变更。

    youdao

  • All changes to the project management plan flow through the change management process and integrated change control.

    所有关于项目管理计划的变更遵守变更管理流程并置于变更控制之下。

    youdao

  • Do you have a strict change control procedure, which follows the requirements of the GMP Guidelines (revised in 2010)?

    您是否建立了符合药品GMP(2010年修订)要求且很严格的变更控制程序?

    youdao

  • Be aware that the concept of change control, and keeping a change log, is generally broader than the troubleshooting arena.

    请注意,更改控制的概念,以及保存更改日志,通常比故障诊断所涉及的领域更加广泛。

    youdao

  • Be familiar with plant, divisional and worldwide goals related to quality, validation, risk management and change control.

    熟悉工厂、区域和全球的涉及到质量、验证、风险管理和变更控制的目标。

    youdao

  • Project teams must treat the baseline as sacred, and only modify it through the change control process as described below.

    项目团队必须严肃对待项目基准,对它的任何改动都必须按照后面所述的流程来进行。

    youdao

  • For contractual relationships with users, it may be necessary to institute strict change control procedures early in Construction.

    对于同用户的契约关系来说,在构建中较早地制定严格的变更控制程序也许是必须的。

    youdao

  • Change control and the processes that surround change control help an enterprise successfully manage a large topology environment.

    更改控制以及围绕更改控制的流程可以帮助企业成功管理大型拓扑环境。

    youdao

  • Good and continued communication between the operations team and the development team will also benefit from change control management.

    更改控制管理还有助于在操作团队和开发团队之间实现良好、持续的交流。

    youdao

  • Governance rules and change control processes for the data architecture, managed jointly by it and appropriate business representatives.

    数据架构的管理规则和变更控制流程,由IT和适当的业务代表共同管理。

    youdao

  • But while change control does need to be a strict process that treats the project baseline as holy, it does not need to be inflexible.

    但是变更控制并不需要严格到把项目基准神圣到不可侵犯的程度,弹性是必要的。

    youdao

  • Many times, the integrated change control process includes a change control board responsible for approving and rejecting the requested changes.

    许多时候,整体变更控制过程包括一个负责批准或否决变更请求的变更控制委员会。

    youdao

  • Another aspect of change control is keeping track of the fact that changes to several files were, in fact, changed together as one logical change.

    变化控制的另一个方面指跟踪这样的情况,即对好几个文件的改变实际上只是同一个逻辑变动。

    youdao

  • During the creation of lessons learned for a project, the team determines that the project would have been better if they had a change control board.

    在准备项目的经验教训时,团队认为如果当初设立变更控制委员会,项目会更好一些。

    youdao

  • After the prospective validation has been completed, change control systems are established to ensure that sterilizers are maintained in a state of control.

    前验证完成后,建立变更控制系统,以确保灭菌器保持在受控状态。

    youdao

  • The classification of cost changes and measures to strengthen cost change control are described based upon the special features of cost changes in EPC projects.

    根据工程总承包项目费用变更的特点,介绍了费用变更的分类,论述了加强费用变更管理的措施。

    youdao

  • Requests are recorded either in change control systems, or even for more informal projects, particularly within eXtreme Programming projects, on CARDS or flip charts.

    请求要么记录在变更控制系统中,要么对于更不正式的项目来说,特别是在极限程序设计项目中,记录在卡片上或活动挂图上。

    youdao

  • The meaning of automatic load change control system used in oxygen making process is introduced according to relationship between steelmaking and oxygen making.

    从转炉生产与氧气生产的关系, 说明采用制氧生产自动变负荷控制的意义, 并阐述自动变负荷系统的原理,控制参数和调节周期。

    youdao

  • When creating the migration plan, you need to consider general queue manager migration issues, clustering specifics, wider system architecture, and change control policies.

    制定迁移计划时,需要考虑常见队列管理器迁移问题、集群细节、更广泛的系统架构和更改控制策略。

    youdao

  • If a proxy vote could change control of a company (a proxy contest), all persons involved in the contest must register with the SEC as participants or face criminal penalties.

    如果委托投票能够改变公司控制权(委托争议),所有争议相关人都必须作为参与人在SEC注册或面临刑事处罚。

    youdao

  • The technology economic evaluation of construction change plan is the important link of construction project change management in the process of construction project change control.

    而建设项目工程变更控制过程中,工程变更方案的技术经济评价是建设项目工程变更控制管理的重要环节。

    youdao

  • Project Procurement Management includes the contract management and change control processes required to administer contracts or purchase orders issued by authorized project team members.

    项目采购管理包括合同管理和变更控制过程,它们是管理由授权的项目团队成员签发的合同或采购订单所必需的。

    youdao

  • For example, for information technology systems, a change control system can include the specifications (scripts, source code, data definition language, etc.) for each software component.

    例如,对于信息技术系统而言,变更控制系统可以包括每一软件组件的技术规定说明书(脚本、源代码、数据定义语言等)。

    youdao