• However, evaluation methods of wall rock stability in underground cavern groups with high side-wall, large span and intersect caverns are required for actual projects such as Nuo Zhadu.

    但在实际的工程中,特别是对于糯扎渡这种边墙高、跨度大、洞室相互交错的地下洞室群的围岩稳定性问题,还缺少系统的评价方法。

    youdao

  • Finally, some useful conclusions for selecting the site of a large-span cavern and for the design and construction of support are given.

    最后,给出了一些对大跨度峒库位置的选择、支护设计和施工方法等有意义的结论。

    youdao

  • Finally, some useful conclusions for selecting the site of a large-span cavern and for the design and construction of support are given.

    最后,给出了一些对大跨度峒库位置的选择、支护设计和施工方法等有意义的结论。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定