Time for the third kind of closing well is so long that flange steel ring groove on the top of casing-head is heavily corroded in M4 well being situated in Tarim basin.
位于塔里木盆地的M4井,由于三类封井时间较长,造成套管头上部法兰钢圈槽严重腐蚀。
Time for the third kind of closing well is so long that flange steel ring groove on the top of casing-head is heavily corroded in M4 well being situated in Tarim basin.
位于塔里木盆地的M4井,由于三类封井时间较长,造成套管头上部法兰钢圈槽严重腐蚀。
应用推荐