• Managers, Mr. Graham believed, will always want to pile up cash to protect themselves in case they make mistakes.

    格拉汉姆认为企业经理人总是积累现金,以便自己万一出现决策失误是对自己提供保护

    youdao

  • I am usually reading three, sometimes four books, with a pile of books waiting in case I run out.

    通常情况下同时三四本书更多存在“后备箱”里,随时准备着。

    youdao

  • To achieve real time automatic levelling and vertical rise up and fall down of the static pile driver′s case, an electro hydraulic levelling system is designed for the static pile driver based on PLC.

    为使静力机在工作过程中能够实现实时自动保持机身水平水平升降,设计一种基于PLC的压桩机电自动调系统

    youdao

  • The design and construction of cantilever Pile Cluster in exterior-protected deep foundation pit are introduced by means of a case record in this paper.

    通过某工程实例介绍了基坑围护工程悬臂式排桩设计施工

    youdao

  • Please do not pile up objects around the attaching plug. It is easy to pull it out in case there is an emergency.

    不要电源插头周围堆放物品以便紧急情况下快速拔出插头。

    youdao

  • In this article, authors introduce the case of an engineering by using subminiature pile in deep foundation pit timbering, and analyse the construction technics and the quality monitor.

    本文介绍工程基坑支护使用微型情况施工工艺质量监测作了分析

    youdao

  • The bearing characteristic of large diameter and super-long pile in quaternary soil layer is analyzed in the case of no good bearing layer (such as rock, sand and cobble layer) and no ripe experience.

    没有良好持力层(基岩或卵石成熟经验可借鉴的情况下,对第四系土层直径超长桩(钻孔灌注桩)的承载特性进行了分析。

    youdao

  • Brief introduction of engineering case for treatment of bridge and culvert soft foundation with gravel pile and of tunnel soft foundation with high-pressure jet grouting pile.

    简单介绍采用碎石进行桥涵处理采用高压旋喷桩进行隧道软基处理工程实例

    youdao

  • The piling technology of thin -wall steel sheet pile on water is discussed combining with an engineering case.

    结合工程实例,介绍水上施打薄壁钢板施工工艺

    youdao

  • Through verification of an engineering case, the authors' work made contribution to the transition of designing method of anti-sliding pile with anchored bolt from definition to reliability.

    通过工程实例验证,为锚杆-抗滑桩系统设计方法确定性分析可靠性分析的过渡作了有益工作

    youdao

  • Through an engineering case, the paper mainly explains the measures taken to dig deeply on a wide area to protect PHC pile and the good effects produced in an engineering case foundation.

    结合工程实例着重阐述进行深基坑大面积开挖过程中,防止PHC折断所采取的一系列措施工程实践中取得了良好效果

    youdao

  • In this paper, the causes of rebound foundation pit result in the crack in the foundation pile were analyzed through the engineering case, and the preventive measures were proposed.

    本文通过实例分析了在深基坑工程,由于基坑回弹导致钻孔灌注桩断桩原因提出了预防措施

    youdao

  • Taking one section of Quanzhou highway as the case, it introduces the application of cement flyash gravel pile (CFG) technology to the soft ground construction.

    福建省泉州沿海大通道秀白段土地基处理采用了水泥粉煤灰碎石简称CFG桩)技术,取得了良好工程效果。

    youdao

  • Both load transfer characteristic and settlement characteristic of single pile can be predicted using this method, through a case, have shown that the new method is rational.

    本文方法能计算荷载传递预测单桩变形特性算例结果表明:本方法较高的计算精度。

    youdao

  • According to a practical case of composite foundation in collapsible loess foundation, the squeezing effects on compaction pile by tamping are studied.

    通过现场试验加固湿性黄土地基机理进行研究。

    youdao

  • In the case of the worse self-standing soil, the structure of composite soil nailing wall with micro-pile of steel pipe is adopted and analyzed in this paper.

    针对自立稳定性较土层本文提出钢管小桩复合支护结构进行探讨。

    youdao

  • Perched proudly on a pile of foam blocks, but holding daddy's hand just in case, Prince George poses for his very first postage stamp alongside his father, his grandfather - and the great-grandmother.

    乔治小王子自豪地泡沫块上还要一边爸爸以防万一摔着。乔治王子父亲祖父还有曾祖母站在一起自己一张邮票摆好造型拍照。

    youdao

  • In the case when the bedrock has a rather high compressive strength, the bearing capacity of rock inlaid grouting piles depends usually on the material strength of the pile mass.

    基岩抗压强度较高时,灌注桩承载力往往由桩材料强度控制。

    youdao

  • In the case when the bedrock has a rather high compressive strength, the bearing capacity of rock inlaid grouting piles depends usually on the material strength of the pile mass.

    基岩抗压强度较高时,灌注桩承载力往往由桩材料强度控制。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定