• Failure of one of two cooling systems in August set off equipment shutdowns. In July, a faulty radio link forced an unmanned cargo ship to delay docking for two days.

    八月份时,两个制冷系统中的一个发生故障引发设备关机

    youdao

  • Grasping the temperature distribution of cargo tank during the pre-cooling is the basis of making a safe and economic pre-cooling plan.

    掌握液舱温度过程中的变化规律制定安全经济预冷方案基础

    youdao

  • Grasping the temperature distribution of cargo tank during the pre-cooling is the basis of making a safe and economic pre-cooling plan.

    掌握液舱温度过程中的变化规律制定安全经济预冷方案基础

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定