集群名为c1。
On c1, how do I evaluate my integral?
那么怎么在c1上计算积分?
I get that the line integral on c1 — Well, a lot of stuff goes away.
得到c1上的线积分,大部分就消去了。
The free connection pool now contains two free connections - c1 and c2.
空闲连接池现在包含两个空闲连接:c1和c2。
By this time, c1 has been in the free connection pool for 6 minutes, and c2 for 3 minutes.
到此时为止,c1已在空闲连接池中存在了6分钟,c2存在了3分钟。
The Web application allows two use cases: one starting from page b1 and one starting from page c1.
该Web应用程序允许两个用例:一种是从页面b1开始,一种是从页面c1 开始。
In this case, the code has actually specified all the members of cluster c1 where the EJB is residing.
在本例中,代码实际上已经指定了EJB所在的集群c1的所有成员。
Since the pool contains two connections, and Minimum connections is set to 1, the connection Manager closes c1.
由于池包含两个连接,并且最小连接设置为1,所以ConnectionManager将关闭c1。
As the free pool for this factory is empty, the connection Manager creates a new connection, c1, and returns it to the application.
因为此工厂的空闲池为空,所以ConnectionManager会创建新的连接c1,并将其返回给应用程序。
This scenario uses Version 8.2 client (c1) and three databases (dbase1, dbase2, dbase3, which belong to instances inst1, inst2, inst3, respectively).
该场景使用 V8.2客户机(c1)和三个数据库(dbase1、dbase2 和dbase3,分别属于实例inst1、inst2和 inst3)。
There is a free connection c1 in the pool, so the maintenance thread looks at the time the connection was put back, and compares this to the current time.
池中有一个空闲连接c1,这样维护线程查看将连接放回的时间,并将其与当前时间进行比较。
You now have a connection c1 in the free pool, so the connection Manager will take this connection out of the pool and make it available to the listener port.
现在,空闲池中含有连接c1,这样ConnectionManager将从该池中取出此连接,并将其提供给侦听器端口。
C1 be the right-most character of s1.
C1是S1最右侧的字符。
C1 Esterase Inhibitor, C1 Inhibitor, Goat anti-Human.
c1酯酶抑制剂,c1抑制剂,山羊抗人。
Methanol is the foundation stone of C1 chemical industry.
甲醇是C1化工的基石。
C1 pedicle screws are stiffer than C1 lateral mass screws.
颈1椎弓根固定较侧块固定更稳定。
OK, so I proved that my two line integrals along C1 and C2 are equal.
我证出了分别沿着C1和C2的两个线积分是相等的。
Methyl formate is one of the important chemical products of C1 chemistry.
甲酸甲酯是重要的化工原料及C1化学中间体。
None were located in front of the medial one third of the C1 lateral mass.
无一例位于C1侧块内侧三分之一前方。
Full range of motion over C1-C2 and peak screw pull-out force was quantified.
定量测定C1-C2最大活动范围和最大螺钉抗拔力。
Methyl formate is one of the hot point chemical products of C1 chemistry at present.
甲酸甲酯是当前世界C1化学化工的热点产品之一。
The dual variable FEM formulation can avoid the difficulty of C1 continuity condition.
对偶变量有限元推导可避免所谓的C1连续性问题。
Relationship Between Screw Trajectory of C1 Lateral Mass Screw and Internal Carotid Artery.
C1侧块螺钉通道和颈内动脉之间的关系。
The result shows that the anomalous peak values of C1 often appear before great earthquakes.
结果表明,每当大震发生前,C_1值均出现异常峰值,异常时间一般不超过一年。
This paper presented a method of constructing a C1 continuous, closed cubic NURBS interpolating curve.
本文给出一种构造C1连续的闭的三次NURBS插值曲线的方法。
Conclusions PWV and C1 could sensitively reflect the improvement of arterial elasticity and the decline of PP.
结论:PWV、C1是敏感反映动脉弹性改善与PP减小的大动脉弹性功能指标。
What is odd is that, according to the plan, the next iteration would be C1, the first iteration of Construction.
奇怪的是,根据计划,下一次迭代是C1,构建的第一次迭代。
The risk of inserting bicortical C1-C2 transarticular and C1 lateral mass screws was estimated based on these measurements.
在这些测量上评估经C1-2关节双侧皮质螺钉及C1外侧块螺钉固定的风险。
Objective To investigate the treatment for complex fractures of the femoral condyle, namely C1? C2 and C3 of AO classification.
目的探讨复杂型股骨髁部骨折,即AO分类的C1、C2和C3型骨折的治疗方法。
In 2007 half the population belonged to the socioeconomic categories C1 (lower-end white-collar workers) and C2 (skilled manual workers).
在2007年英国一半的人口属于社会经济学上的C1类(较低层白领工人)和C2类(熟练的手工工人)。
应用推荐