Paksey bridge is the second largest bridge project next to Jamuna bridge in Bangladesh.
帕克西桥是孟加拉国继贾木纳桥后的第二大桥梁工程。
And today, more common concrete cracks, cracks in the bridge project almost omnipresent.
而在今天,混凝土的裂缝较为普遍,在桥梁工程中裂缝几乎无所不在。
For more information about the JBoss Portlet Bridge project visit the project page, documentation, or wiki.
如果想要了解JBossPortletBridge项目的更多信息,请访问项目网站,文档库或者wiki。
DTJCB copies this file from its original location to the bridge location inside the RJCB bridge project directory.
DTJCB把该文件从其原始位置复制到rjcb桥项目目录下的桥的位置上。
If that still need to praise and description of the fall, it would be difficult passage across the bridge project.
如果说秋天仍需要赞美和描写,那将是一段文字桥梁难以跨越的工程。
Governor of Russia's Amur Region, Andrey Kozlov, says the new bridge project will also help cross-border exchanges.
俄罗斯阿穆尔地区州长安德烈·科兹洛夫表示,新建大桥项目还将有助于跨国交流。
The applications of soil gradation index in road and bridge project and its practical meaning were discussed in this article.
主要论述了土的级配指标在工程中的应用,对路桥工程具有一定的实际意义。
The bridge project, Caidian Hanjiang River, requires High Performance Light-Weight Concrete due to its structural design changing.
蔡甸汉江大桥由于结构设计变更,要求桥面混凝土采用轻质高性能混凝土。
The mathematical model of slab stayed bridge for dynamic analysis is discussed with a railway slab stayed bridge project as an example.
以某铁路斜拉板桥方案为例,探讨斜拉板桥的动力分析模型。
In combination with the Heigou Bridge Project in inner Mongolia, the methods of construction stress control are discussed in this paper.
结合内蒙古黑沟特大桥工程实例,探讨了预应力混凝土连续刚构桥的施工应力控制方法。
However, if the arch is too large, for the bridge project, it caused road and bridge irregularities, resulting in traffic and negative effects.
然而如果拱度过大,对于桥梁工程来说,造成公路桥梁路面不平顺,导致行车不顺畅,产生负面效果。
The new model is used in a through tied arch bridge project, with a comparison of three maintenance proposals, and proves applicable and effective.
通过一座下承式系杆拱桥的工程实例,应用该模型比较了三种不同的养护方案,验证了该模型的实用性和有效性。
A study of the stress and strain distribution of anchorage zone in a long span PC box girder was undertaken in the background of Hangzhou Bay Bridge project.
本文以杭州湾跨海大桥北航道非通航孔桥为工程背景,对大跨度预应力混凝土箱梁锚固区混凝土的应力应变分布特征进行了分析研究。
Bridge project in Xian City, the article introduces the arch steel pylon rotating construction scheme able to provide the reference for the similar projects.
该文结合西安市浐灞河2号桥工程,介绍了拱形钢塔竖转施工方案,可供类似工程参考借鉴。
According to the overpass bridge project of Miaohong Line in Pingdingshan, the construction technology of cast-in-situ concrete continuous box beam is introduced.
通过平顶山市庙洪线西斜立交桥工程实例,介绍了现浇混凝土连续箱梁的具体施工方法,并对施工中的关键工序进行了系统探。
In this paper, Xinzhaihe bridge Project, the use of gray forecasting control systems, during construction of the bridge construction in the state of the predictive control.
本文结合新寨河特大桥工程实例,运用灰色预测控制系统,对该桥在施工过程中各施工状态进行预测控制。
The swift start on the Xiangshan Island Bridge project reflects years of preparatory work, a top-down administration that tolerates little dissent and a pipeline of projects.
象山港大桥的迅速开工反映了这么多年周到的准备工作,至上而下异议不多的行政管理,以及大量的项目资源。
The paper analyses the bore pile accident appearing in the pile foundation construction of bridge project, and introduces the treatment methods of bore pile accident and quality defect.
文中通过对桥梁工程桩基施工中出现的钻孔桩事故进行分析,介绍了一些钻孔桩事故和质量缺陷的处理方法。
With reference to the gravity survey, this paper describes the schemes of control network layout used with global positioning system (GPS) technique for Donghai Bridge project over sea.
结合重力测量,介绍利用GPS技术进行东海大桥跨海工程控制网的布设技术方案。
A suspension bridge project is taken as an example, in which the evolution of critical wind speed of flutter during bridge erection is studied by a multi-mode flutter analysis approach.
以某悬索桥设计方案为工程背景,应用多模态颤振分析方法,分析了该桥架设阶段颤振临界风速的发展趋势。
Abstract: Based on the actuality of current road & bridge project bid works, centered on improving bid quotation level of it, discusses how to raise bid winning rate and economic effect.
根据当前路桥工程施工投标工作的实际,着重围绕提高路桥工程施工投标报价水平,探讨如何提高中标率和经济效益。
Products: series of casting for mine, cement, metallurgy, heavy duty equipment, bridge project, heavy duty auto etc. , Which including of cast steel, alloy steel, height alloy cast steel.
矿山、水泥、冶金、重型设备、桥梁工程、重型汽车等系列,碳钢、合金钢、高合金钢铸钢件。
The paper mainly introduces the main parameters such as general situation, structure design and construction control etc. as well as the key technology of the cable stayed bridge project.
本文主要介绍该斜拉桥的工程概况、结构设计以及施工控制等主要参数和关键技术。
An efficient, excellent and safe way to complete the construction of pier footings at the non-navigable spans over the sea is one of the key points for the success of the East sea Bridge Project.
采取何种高效、优质、安全的施工方法完成跨海段非通航孔桥墩承台施工是东海大桥工程建设能否取得成功的关键之一。
An efficient, excellent and safe way to complete the construction of pier footings at the non-navigable spans over the sea is one of the key points for the success of the East sea Bridge Project.
采取何种高效、优质、安全的施工方法完成跨海段非通航孔桥墩承台施工是东海大桥工程建设能否取得成功的关键之一。
应用推荐