The bridge foundation position on high-steep slope is not specified definitely in current corresponding norms or hand books.
而目前相应的规范及手册中,对高陡边坡桥基位置没有明确的规定。
The bridge foundation position is verified or modified through analyzing rock mass stress under bridge foundation at different bridge foundation positions.
通过对不同位置桥基基底岩体应力的分析,进行桥基位置的验证或修正。
The rock mass strength under load at determined bridge foundation position is checked with strength criterion to determine the reasonable position of the bridge foundation.
用岩体强度准则对桥基位置下岩坡岩体强度进行校核,最终确定桥基合理位置。
Research purposes: the bridge foundation position on high-steep slope has great effect on stability of slope and bridge, it also affects the technical index and cost of bridge.
研究目的:高陡边坡桥基位置的确定不仅关系到高边坡的稳定和桥梁的安全,也直接关系到整个桥梁的技术指标和造价。
Anchorage foundation is the key position of a suspension bridge, whose overall stability and bearing state directly influence the safety and long-term reliability of the bridge.
锚碇基础是悬索桥的关键受力部位,它的总体稳定性和受力状态直接影响到大桥的安全和长期使用的可靠性。
Anchorage foundation is the key position of a suspension bridge, whose overall stability and bearing state directly influence the safety and long-term reliability of the bridge.
锚碇基础是悬索桥的关键受力部位,它的总体稳定性和受力状态直接影响到大桥的安全和长期使用的可靠性。