The requirement team continues working on baseline bl2 (branch rq_bl2).
需求团队继续处理基线bl2(分组rq_bl2)。
The software development team continues working based on the baseline bl2 (branch rq_bl2).
软件开发团队继续在基线b12 的基础上工作(分组rq_bl2)。
Based upon the branch for baseline bl1 (main) and the label (RQ_BL1), the next baseline (bl2) is created (branch rq_bl2).
在基线b11和标签(RQ_BL1)的基础上,下一个基线(b12)被创建(分组rq_bl2)。
When the work for baseline bl1 (the main branch) is finished, and the switchover to baseline bl2 (branch rq_bl2) is going to happen, you need to perform the following steps.
当基线b11(主要分组)的工作完成时,并且已经切换至基线b12(分组rq_bl2)时,您需要完成以下步骤。
When the work for baseline bl1 (the main branch) is finished, and the switchover to baseline bl2 (branch rq_bl2) is going to happen, you need to perform the following steps.
当基线b11(主要分组)的工作完成时,并且已经切换至基线b12(分组rq_bl2)时,您需要完成以下步骤。
应用推荐