For cost control in main stage construction, three aspects are expected to be in deep-depth study: the bidding phase, the construction phase, the phase of final acceptance.
对施工阶段造价控制主要从三个方面进行深入研究,即招投标阶段、施工阶段、竣工验收阶段;
Cost control runs through the whole process of construction projects. The cost control measures of design phase, bidding phase, construction phase and completion phase of construction are described.
造价控制贯穿于工程项目建设的全过程,阐述了设计阶段、招标投标阶段、施工阶段和竣工阶段控制工程造价的措施。
The results show that there are eight different stakeholders in bidding phase. The supervisor's leadership, the construction unit and the tenderer are the core stakeholders and have leading position.
研究结果表明:其招标投标活动的利益相关者主要有八个不同利益主体,其中主管领导、建设单位和投标人居于主导与核心位置;
The results show that there are eight different stakeholders in bidding phase. The supervisor's leadership, the construction unit and the tenderer are the core stakeholders and have leading position.
研究结果表明:其招标投标活动的利益相关者主要有八个不同利益主体,其中主管领导、建设单位和投标人居于主导与核心位置;
应用推荐