The erosion depth in the hearth of No. 8 BF were determined before blow-down in it's 1st relining, and the salamander-taphole was positioned reasonably and the salamander as tapped successfully.
宣钢8号高炉第一代大修时,在停炉前对炉底侵蚀深度进行了计算,并确定了残铁口的位置,使停炉后放残铁取得了成功。
The erosion depth in the hearth of No. 8 BF were determined before blow-down in it's 1st relining, and the salamander-taphole was positioned reasonably and the salamander as tapped successfully.
宣钢8号高炉第一代大修时,在停炉前对炉底侵蚀深度进行了计算,并确定了残铁口的位置,使停炉后放残铁取得了成功。