• It is the first time that large-area manually excavated piles were applied as the foundation of? Structure? In ship-building berth project.

    在船台工程上大面积使用人工挖孔桩作为结构的基础在国内尚属首次。

    youdao

  • Berth in Dongdu Port Area of Xiamen Port, the paper expounds the working mechanism, method design and result of execution of underwater strap-on blasting method for demolition of the pile foundation.

    通过对厦门东渡19号泊位桩基码头几种桩基拆除试验及工期成本分析,重点阐述了水下捆绑爆破法的工艺原理、方案设计及实施效果。

    youdao

  • Berth in Dongdu Port Area of Xiamen Port, the paper expounds the working mechanism, method design and result of execution of underwater strap-on blasting method for demolition of the pile foundation.

    通过对厦门东渡19号泊位桩基码头几种桩基拆除试验及工期成本分析,重点阐述了水下捆绑爆破法的工艺原理、方案设计及实施效果。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定