• Some stabilizing structures must be set before cutting a bedding high rock slope, and how to determinate the range of disturbed zone becomes the key problem.

    开挖岩石高边坡,往往需要进行预加固,因而合理确定坡体开挖松动范围就便成为核心问题

    youdao

  • The utility model solves the problem of the existing die cutter needing the bedding under the stamping-out object to keep the cutting plane of the cutter parallel with the stamping-out plane.

    实用新型解决了现有在被冲压下面进行铺垫才能使刀具切割平面被冲压面平行问题

    youdao

  • The utility model solves the problem of the existing die cutter needing the bedding under the stamping-out object to keep the cutting plane of the cutter parallel with the stamping-out plane.

    实用新型解决了现有在被冲压下面进行铺垫才能使刀具切割平面被冲压面平行问题

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定