The hollow beam construction not only produce the stress concentration, reduce the effect of beam mass but also extended the bandwidth.
采用空心梁结构不仅能产生应力集中而且能减少梁的自身质量带来的影响,可以有效地展宽频带。
The article studies for the future of prestressed steel beam construction error on the structural effects of the accumulation of information.
本文对此进行研究,为今后的预应力钢束施工误差对结构影响积累资料。
In the slab beam construction, common support methods include full support method, cross shape steel method, embedded steel sheet, holt hoop iron method, etc.
在盖梁施工过程中,常用的支撑方法有满堂支架法、横穿型钢法、预埋钢板法、抱箍法等。
Sootblowers shall have steel box beam construction to enclose the drive mechanism, motor, lance and other moving or hot parts for complete personnel protection and safety.
为了能对人员完全起到保护和安全作用,吹灰器应有钢制箱梁结构来密封驱动机构、电机、吹灰枪和其它活动或较热部件。
Suspension Cast-in Situ Beam construction is to control the construction process and bridge state of internal force and linear, so that the bridge State could fully meet the design requirements.
公路悬浇梁施工监控就是控制施工过程中和成桥状态时结构的内力和线形,以使悬浇梁的成桥状态充分满足设计要求。
In design and construction of composite arch and Beam bridge, it is very important to determine the boom tensile force when the bridge is almost completed.
在拱梁组合桥梁设计和施工分析中,确定成桥状态时的吊杆张拉力非常关键。
The choice form, should consider the spot construction term and the high degree of the hat beam, should still consider the economic costs with can acquire necessary material locally to the best.
支架形式的选择,应考虑现场施工条件与帽梁的高度还应考虑经济成本和尽量能就地取材。
For some problem in the construction of prestress beam slab, the paper analyzed and discussed its cause, and proposed protective measures and methods.
针对预应力梁板施工中较常遇到的一些问题,对其产生的原因进行了较为详细的分析与探讨,并提出了具体的预防措施和救治方法。
Based on an engineering example, author introduce design and construction of prestressed large-span, large section beam formwork and formwork supports.
本文结合实际工程,介绍了长乐会堂工程大跨度、大截面预应力大梁的模板及支撑系统设计及施工中的技术要点控制。
But mostly, the beam slab structure is adopted as superstructure which causes some weakness in construction and use of high-pile wharf.
但是上部结构却大都采用梁板结构,这使得高桩码头在施工和使用上存在着一些缺点。
Good or poor construction of beam columns affects the quantity of buildings directly.
梁柱节点的施工优劣直接影响着房屋的质量。
Introduce the massive concrete construction technique and experience in annular beam of Nantong gymnasium meeting and exhibiting center.
介绍了南通市体育会展中心体育场环梁大体积混凝土的施工技术和经验。
The structural form and the construction of RC column-steel beam joints for an adding storey project are introduced.
对某高层酒店改建工程加层的结构方案和改造设计中梁柱节点的构造细部进行了介绍。
Anchor-cable lattice beam is introduced on its design, construction and application effect in treatment of rock landslide by field case.
通过某市友谊大道滑坡工程实例,介绍锚索格构梁在岩质滑坡治理中的设计、施工方法及效果。
In the paper, spear lag of beam plated construction and effective distribution width of flange plate are analysed through model test and research. It provides a reference in design.
本文通过大型试验的研究,分析梁板结构截面的剪力滞效应,及翼缘板的有效分布宽度,为设计提供参考。
The controlled crucial works for this contract section is the construction for the prestressed concrete continuous combined box beam.
本合同段控制性关键工程是预应力砼连续组合箱梁的施工。
Finally the reinforcement forms of the bracket and the connecting construction between the bracket and the beam are proposed.
最后给出了牛腿的配筋形式以及牛腿和梁之间的连接构造。
This paper introduces the the design checking, process, construction methods and quality control of capping beam and embraces hoop method.
文章介绍了抱箍法盖梁施工的设计验算、工艺流程、施工方法及质量控制。
The advantages and construction process of bumping beam method used in recovering flooded slope are introduced.
介绍了撞楔法在恢复水淹斜井中的优点与施工过程。
Prebent combined simple supported beam, combining steel plate with concrete, is a new type beam structure. This paper introduces the basic conception, design and construction of this combined beam.
预弯组合简支梁,是钢板与混凝土相结合的一种新型梁式结构,本文介绍该组合梁的基本构思及设计、施工等内容。
In order to ensure the normal operation of traffic in construction the continuous box beam 's construction adopts cross beam as supporting system and Bailey member bars as abutments.
为保证在施工期间的交通正常运行,连续梁的施工特采取贝雷杆件组拼支墩和横梁作为支撑系统。
A further discussion was carried out on the Basket of Cantilever construction of the main beam in the structure.
对挂篮主梁悬浇施工中出现的构造和功能方面的问题作了进一步的探讨。
Concrete vertical transportation, eccentricity control of pier top and construction of top hat beam are the difficult points for present project.
混凝土的垂直运输、高桥墩顶偏心控制、帽梁施工是该工程施工的难点。
With practical examples, installation of pier top beam section to sum up the construction process, construction process and stressed the important and difficult.
结合工程实例,对墩顶梁段安装施工工艺进行总结,并强调施工过程中的重点和难点。
Some diseases usually appear in the tension construction of post-tensioning prestressed concrete beam slabs.
后张法预应力混凝土梁板在张拉施工过程中,经常会出现一些施工病害。
For the construction process of twice prestressed continuous beam, the stress analysis and deformation analysis method during construction stage is provided in this paper.
根据二次预应力连续梁的施工过程,提出了施工阶段的应力和变形分析方法。
By the construction practice of pre-reserved beam sump in the shaft construction of Guqiao Coal Mine, goes further into the technical factors and pre-reserved result ect.
通过顾桥矿井筒施工过程中预留梁窝的施工实践,探讨了井筒掘砌中预留梁窝施工的技术因素、预留效果等。
The floor and ceiling components are constructed out of glulam, the walls are constructed from a beam and post construction planked and insulated on both sides.
地板和天花板组件是胶合构造,墙是建于梁和柱结构的平板,并于两边绝缘。
The floor and ceiling components are constructed out of glulam, the walls are constructed from a beam and post construction planked and insulated on both sides.
地板和天花板组件是胶合构造,墙是建于梁和柱结构的平板,并于两边绝缘。
应用推荐