Bulwark plate to be thickened and stiffener to be added in way of mooring hole.
在设置导缆孔处舷墙板增加板厚和加强筋。
The tailing of mineral processing in a lead-zinc mine has to be thickened before transportation due to the limited tailings transportation capacity.
某铅锌矿因受尾矿输送设备能力的限制,需对选矿尾矿进行浓浆输送。
The tailing of mineral processing in a lead-zinc mine has to be thickened before transportation due to the limited tailings transportation capacity.
某铅锌矿因受尾矿输送设备能力的限制,需对选矿尾矿进行浓浆输送。
应用推荐