• Concrete was poured in separately from mid-span of arch slab to the supports and then from the supports to the top chord of the arch chord so as to balance the pouring load.

    分两组下弦中同时拱板支座浇筑混凝土然后拱板支座连续沿拱板上弦中间合龙,使浇筑荷载相对均衡